Nop no operation instruction , Electrical Engineering

Assignment Help:

NOP No Operation Instruction

No operation  is performed  when this  instruction is executed. The instruction format is

            NOP

All  registers and flags  remained  unaffected by the  execution of this  instruction.


Related Discussions:- Nop no operation instruction

Fourier deries, how to compute the fourier series expansion of a rectangula...

how to compute the fourier series expansion of a rectangular pulse train

Positive and negative clippers, Positive Clippers The shunt connected p...

Positive Clippers The shunt connected positive clipper, in which the diode conducts for positive half cycle and hence, the output is a straight line. During the negative half c

Explain rs422a standard, Explain RS422A standard. RS422A: 1.  Date...

Explain RS422A standard. RS422A: 1.  Date Rate: 10 Mbits per second 2.  Driving capability up to 4000ft and 10 receivers 3.  This is Differential standard that is- a

Determine the location and the value of the point charge, Q. The electric f...

Q. The electric field intensity due to a point charge in free space is given to be Determine the location and the value of the point charge.

Explain overhead lines and transformers, Explain Overhead Lines and Transfo...

Explain Overhead Lines and Transformers? Overhead lines absorb reactive power when fully loaded. A line with a current I A, a line reactance of X L ?/phase absorbs I 2 X L V

Find the expression for the no-load speeds, Q For a three-phase, fully cont...

Q For a three-phase, fully controlled, recti?er-fed, separately excited dc motor, corresponding to ideal no-load operation, find the expression for the no-load speeds. Comment on w

Identify a variety of security threats, Each year the University computer s...

Each year the University computer society holds a „virtual fair? in Second Life in order to raise money for charity. The main attraction at the event is a lucky dip, where attendee

Quality of supply and services - power distribution, Quality of Supply and...

Quality of Supply and Services  - Power Distribution For effectual management and performance improvement it is essential to measure the several defined parameters of the proc

For sign flag - conditional jumps , For  Sign  Flag JP ( jump  on ...

For  Sign  Flag JP ( jump  on plus ) Jump  on minus ) Instructions JP  transfer  the execution of the program to the specified  memory  address if  sign  flag is set (S=

Given a system; how to find feedback, I am working on Vision based vehicle ...

I am working on Vision based vehicle lane keeping control system. I have uploaded two images at http://tinypic.com/view.php?pic=24gj85t&s=6 & at http://tinypic.com/view.php?pic=

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd