Net present value method: npv, finance, Other Engineering

Assignment Help:
Discounted cash flow methods
Net present value method: NPV
It is one of the classic methods of evaluating the investment project. Here each potential projects value is find out its net present value (NPV). This method considers the time value of money and should that cash flow arising at different time differ in value, hence need to find out its present value (Robert Parrino & David s. Kidwell, 2009).
Steps involved in the calculation NPV:
• Find out the cash inflow from a project based on realistic assumption.
• Determine the appropriate discounted rate.
• Calculate the present value of cash inflow based on discounted rate.
• Net present value is calculated by deducting present value of cash outflow from the present inflow (I.M. Pandey, 2005).
Accept Reject rule:
Accept the project if NPV is positive NPV>0
Reject the project if NPV is negative NPV<0 (Robert Parrino & David s. Kidwell, 2009).
Merits of NPV:
• The value of money is considered.
• NPV considers cash flow occurring in the life of the project to calculate its worth.
• This method considers discounting rate to calculate present value of cash flow.
• This method considers the objective of maximizing shareholders wealth (I.M. Pandey, 2005).
Demerits to NPV:
• Difficult to forecast future cash flow as future is uncertain.
• If right discount rate is not considered then it leads to wrong investment decisions.
• It is not suitable when alternative projects with unequal lives exist (I.M. Pandey, 2005).

Related Discussions:- Net present value method: npv, finance

Moulding materials, The commonly used moulding materials for mould making...

The commonly used moulding materials for mould making can be broadly classified into the following two groups :             (a) Metals : Including grey cast iron, steel and an

Where do you think by djia?, Where do you think by DJIA? Nobody knows th...

Where do you think by DJIA? Nobody knows the respond to this one. However, you should at least have some ideas on the topic and be able to communicate why you think this is the

Finance ass, Let C(K) denote a European vanilla Call option with strike pri...

Let C(K) denote a European vanilla Call option with strike price K. Assume that all options are identical except for strike price, and strike prices satisfy (K1) What are the no-

Small business management, how to calculate the ratio and break-even point ...

how to calculate the ratio and break-even point in one report

Present worth equivalence in economical engineering, Present Worth equivale...

Present Worth equivalence: Since we have developed the relationship to find a future value F given a present value P, we can easily derive the formula to find a (P|F, i, n), w

Heat conduction problem in hollow cylinder, Heat conduction problem in holl...

Heat conduction problem in hollow cylinder There are a lot of researches for calculating the temperature field in various shapes using different boundary and initial cond

Structural engineering, The closed form solutions for ?max and Mmax are giv...

The closed form solutions for ?max and Mmax are given on page 16.1-276 for several axial loads. Figure C-C2.2 summarizes the results for the first benchmark problem and Figure C-C2

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd