The following tasks shall be accomplished at the Facility site prior to setting the modules on the piles:

After module support piles have been installed, the cap plate of each pile shall be surveyed to determine the top elevation of the cap plate when flat shim plates are used. Survey each corner of the cap plates when tapered shims are used. Refer to the construction drawings as appropriate, for various site conditions.

The ground between the piles shall be cleared of debris and the entire area shall be levelled as required to suite the placement of module either by crawler, RTVs and/or crane. The Project Site construction support shall obtain from logistics the area and elevation of the ground that needs levelling. In many instances an area in front of RTV or crawler setting the modules must also be levelled.


Related Discussions:- Module site installation preparation

Express the compression force of hydraulic cylinder, Express the compressio...

Express the compression force C in the hydraulic cylinder of the car hoist in terms of the angle Θ, see Fig Q3. The mass of the hoist is negligible compared with the mass of the ve

What is the density of plastic, Plastics are the common term for a wide ran...

Plastics are the common term for a wide range of synthetic or semi synthetic polymerization products. There are many dissimilar plastics; all have their own density!

Evaluate velocity of the block, Evaluate velocity of the block: A blo...

Evaluate velocity of the block: A block of 2500N rest on horizontal surface. The coefficient of friction in between block and plane is 0.3. The block can be pulled by the for

Illustrate the gks system, Illustrate the GKS system The user communica...

Illustrate the GKS system The user communicates with the graphic system via his program. The GKS system is embedded in the user program by an application-oriented layer and a l

Copper-beryllium alloys, Copper-Beryllium Alloys Copper-beryllium allo...

Copper-Beryllium Alloys Copper-beryllium alloys comprise between 0.6 to 2% Be and 0.2 to 2.5% Cobalt. Such alloys can be precipitation hardened and cold worked to improve a te

Fracton steam, calculate the dryness fractin of steam which has 1.5kg of wa...

calculate the dryness fractin of steam which has 1.5kg of water in suspension with 50kg of steam

Evaluate the temperature gradient in the flow direction, A plane wall (ther...

A plane wall (thermal conductivity = 10.2 w/m o c) of 100 mm thickness and area 3m 2 has steady surface temperature of 170 o c and 100 o c. Evaluate :- (i) The temperature

Illustrate about the three authors of iges, Illustrate about the three auth...

Illustrate about the three authors of IGES In 1977, the three authors of The Initial Graphics Exchange Specification were recognized collectively for their contributions to the

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd