Q. Module Site Installation Preparation?

The following tasks shall be accomplished at the Facility site prior to setting the modules on the piles:

After module support piles have been installed, the cap plate of each pile shall be surveyed to determine the top elevation of the cap plate when flat shim plates are used. Survey each corner of the cap plates when tapered shims are used. Refer to the construction drawings as appropriate, for various site conditions.

The ground between the piles shall be cleared of debris and the entire area shall be levelled as required to suite the placement of module either by crawler, RTVs and/or crane. The Project Site construction support shall obtain from logistics the area and elevation of the ground that needs levelling. In many instances an area in front of RTV or crawler setting the modules must also be levelled.

Posted Date: 7/8/2013 12:51:55 AM | Location : United States







Related Discussions:- Module site installation preparation, Assignment Help, Ask Question on Module site installation preparation, Get Answer, Expert's Help, Module site installation preparation Discussions

Write discussion on Module site installation preparation
Your posts are moderated
Related Questions
How do we calculate BMD for the all type of beams?

Use s of Carnot Cycle: 1. It helping us to appreciate what factors is desirable in the design of practical cycle; namely a maximum possible temperature range. 1 maximum p

Limit of proportionality: Limit of proportionality is the stress at which the stress - strain diagram ceases to be a straight line that is, stress at which the extension ceas

LOW ALLOY CREEP RESISTING ELECTRODES AND ELECTRODES FOR CRYOGENIC APPLICATIONS The flux coating contains small amount of alloying elements like Cr, Mo and sometimes V for creep r

(a) What do you understand by the following : (i) Open System (ii) Closed System (iii) Concept of ‘Work' (b) 0.014 m 3 gas at a pressure of 2070 KPa expends to a pressure of

a) Describe the role of value engineering in new product design and manufacturing. b) Elaborate the basic concept of Just-in-Time in context of optimization of inventory costs.

basics of static balancing.


Working of Sleeve in Radial drilling machine The sleeve or quill assembly does not revolve but might be slide in its bearing in a direction parallel to its axis. When the slee

Schedule Selection Of the p excellent continuations, q (first) operations are scheduled. This offers p latest partial schedules. After that step 1 is repeated. These steps'