The following tasks shall be accomplished at the Facility site prior to setting the modules on the piles:

After module support piles have been installed, the cap plate of each pile shall be surveyed to determine the top elevation of the cap plate when flat shim plates are used. Survey each corner of the cap plates when tapered shims are used. Refer to the construction drawings as appropriate, for various site conditions.

The ground between the piles shall be cleared of debris and the entire area shall be levelled as required to suite the placement of module either by crawler, RTVs and/or crane. The Project Site construction support shall obtain from logistics the area and elevation of the ground that needs levelling. In many instances an area in front of RTV or crawler setting the modules must also be levelled.


Related Discussions:- Module site installation preparation

What are the role of roads in design of a plant, Q. What are the role of Ro...

Q. What are the role of Roads in design of a plant? Roads are an important part of the design of a plant, as they provide access and separation during normal operation as well

Project in Automobiles or Robotics, I am studying in Final Year of Engineer...

I am studying in Final Year of Engineering(Mechanical) and I would like some help for the project. It will be helpful if you suggest some project related to Automation.

Disc clutch friction thickness, Disc clutch friction thickness: Check disc...

Disc clutch friction thickness: Check disc clutch friction thickness which should be minimum of 2.6 mm.

Determine maximum stress and modulus of elasticity, Determine maximum stres...

Determine maximum stress and modulus of elasticity:  A composite of glass fibres and epoxy has all of fibres laid along the length and is needed to carry a stress of 12 MPa. T

Calculate the shear flows at the wall, The tapered, two-cell beam is subjec...

The tapered, two-cell beam is subjected to a pure torque of 50,000 in-lb counter clockwise. The length of the beam (normal to the figure) is 100 in. The flange areas are 1 sq in an

Choose a wire rope for a vertical mine hoist, Choose a wire rope for a vert...

Choose a wire rope for a vertical mine hoist to lift a load of 55 kN from a depth of 300 metres. A rope speed of 500 metres/min is to be attained in 10 seconds.

Mounting systems for the welding head-carriage mounted type, Mounting Syst...

Mounting Systems For The  Welding Head-Carriage mounted type In this set up, the welding head is mounted on a movable carriage. The carriage is mounted on rails and powered by a

Design storage compounds for bulk solids, Q. Design Storage compounds for b...

Q. Design Storage compounds for bulk solids? Storage compounds for bulk solids, liquids and liquefied gases are normally included in a plant layout to provide short term storag

Steam mass capacity, I have 5000 kg boiler capacity. In flow of 1 m3 gas fl...

I have 5000 kg boiler capacity. In flow of 1 m3 gas flow how much steam I can produce

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd