Q. Module Site Installation Preparation?
The following tasks shall be accomplished at the Facility site prior to setting the modules on the piles:
After module support piles have been installed, the cap plate of each pile shall be surveyed to determine the top elevation of the cap plate when flat shim plates are used. Survey each corner of the cap plates when tapered shims are used. Refer to the construction drawings as appropriate, for various site conditions.
The ground between the piles shall be cleared of debris and the entire area shall be levelled as required to suite the placement of module either by crawler, RTVs and/or crane. The Project Site construction support shall obtain from logistics the area and elevation of the ground that needs levelling. In many instances an area in front of RTV or crawler setting the modules must also be levelled.
Estimate the Cutting Time A surface 115 mm wide and 250 mm long is to be rough milled with a depth of cut of 6 mm by a 16-tooth cemented carbide face mill 150 mm in diameter.
An internal wheel B with 80 teeth is keyed to shaft F. A fixed internal wheel with 82 teeth is concentric with B. A compound wheel DE gear with two internal wheels, D has 28 teeth
dynamic analysis of four bar linkage by kelin''s construction.
Q. Briefly explain Model scale design? Knowledge of dynamic similarity conditions enables evaluation of model scales. Almost alI the problems related to river hydraulics are ab
Prepare a design of close coiled helical compression spring for a service load ranging from 2250 N to 2750 N. The axial deflection of the spring for the load range is 6 mm. Conside
Q. can you explain Shell molds? These molds are prepared by pouring a mixture of sand and thermosetting resin over the heated surface of a metallic pattern, which results into
Air enters the compressor of an ideal air standard Brayton cycle at 100kPa, 250C with a volumetric flow rate of 8m3/s and is compressed to 1000kPa. The temperature at the inlet to
Find out the forces in the members of the tower: Find out the forces in the members of the tower. Solution By symmetry, ∠ AFG = ∠ AGF = θ and HG = 7.5 m; while AH = 3
1. The linkage system below consists of two bars A & B plus 4 linkages. Each linkage has a square cross section. The allowable tensile strength of all members is 200 MPa, the allow
Q. Procedure for calculating the wind force on vessels? The National Building Code of Canada has a similar procedure for calculating the wind force on vessels as ASCE. The bas
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd