Q. Module Site Installation Preparation?

The following tasks shall be accomplished at the Facility site prior to setting the modules on the piles:

After module support piles have been installed, the cap plate of each pile shall be surveyed to determine the top elevation of the cap plate when flat shim plates are used. Survey each corner of the cap plates when tapered shims are used. Refer to the construction drawings as appropriate, for various site conditions.

The ground between the piles shall be cleared of debris and the entire area shall be levelled as required to suite the placement of module either by crawler, RTVs and/or crane. The Project Site construction support shall obtain from logistics the area and elevation of the ground that needs levelling. In many instances an area in front of RTV or crawler setting the modules must also be levelled.

Posted Date: 7/8/2013 12:51:55 AM | Location : United States







Related Discussions:- Module site installation preparation, Assignment Help, Ask Question on Module site installation preparation, Get Answer, Expert's Help, Module site installation preparation Discussions

Write discussion on Module site installation preparation
Your posts are moderated
Related Questions
The space truss is supported by a ball-and-socket joint at D and short links at C and E. Determine the force and stress in each member and state if the members are buckle or

Two concentric perforared plates are seperated by a 200mm launder and form the flow exit for a clarifier (figure 1). The inlet water flow of 1200 mcubed/hour into the clarifier is

What is the aim of PDES The aim of PDES is to provide an interface which permits the exchange of data of the entire product development cycle and production cycle, see also PDE

Clutch cable routing : Ensure that the cable is routed as per standard routing, through the brackets provided.

Can I have a quote for answers relating to this question (6 and 7) on my paper. Thanks

Two bodies of mass 1 kg and 2 kg move towards each other in mutually perpendicular direction with velocities 3m/s and 2 m/s respectively. If the bodies stick together after collisi

Types of Holons The four major types of holons are: Order holons Product holons Resource holons Staff holons Considering the cooperative aspect of the

Power metallurgy is much faster production whereas holding closer sizes.

If Equivalent force F and F acting on rigid body are not in line Sol.: If equivalent force of same magnitude 'F' acting on the rigid body are not in line, then there is no c

RECTIFIER TYPE POWER SOURCES The next popular power sources are of rectifier type. Three phase transformer (step down) connected to a rectifier to give DC output is the simple