The following tasks shall be accomplished at the Facility site prior to setting the modules on the piles:

After module support piles have been installed, the cap plate of each pile shall be surveyed to determine the top elevation of the cap plate when flat shim plates are used. Survey each corner of the cap plates when tapered shims are used. Refer to the construction drawings as appropriate, for various site conditions.

The ground between the piles shall be cleared of debris and the entire area shall be levelled as required to suite the placement of module either by crawler, RTVs and/or crane. The Project Site construction support shall obtain from logistics the area and elevation of the ground that needs levelling. In many instances an area in front of RTV or crawler setting the modules must also be levelled.


Related Discussions:- Module site installation preparation

Find the twist of a circular hollow shaft, Find the twist of a circular hol...

Find the twist of a circular hollow shaft: Discover the twist per metre length of a circular hollow shaft having 120 mm outer diameter and 90 mm inner diameter, respectively,

Explain the cushion materials which used in moulding sand, Q. Explain the C...

Q. Explain the Cushion Materials which used in moulding sand? These materials when added to the moulding sand burn and from gases when the molten metal is poured into the mould

Show maximum allowable working pressure, Q. Show Maximum Allowable Working ...

Q. Show Maximum Allowable Working Pressure? The MAWP to be marked on the Section VIII nameplate is defined as the maximum gauge pressure permissible at the top of a completed v

Dual combustion cycle, In an I.C. engine operating on the Dual combustion c...

In an I.C. engine operating on the Dual combustion cycle, the temperature of the working fluid (air) at the beginning of compression is 27ºC. The ratio of the maximum and minimum p

Determine in detail about the depth of foundation, Location with Respect to...

Location with Respect to Depth The depth below ground level at which the bottom of a foundation structure is located depends on number of factors, the most important of which

Brittle fracture, Dear Sir I would to know what is the min. time required...

Dear Sir I would to know what is the min. time required for carbon steel tube A214 @ zero C to 50 C

Fricion, what force will be neccesary to just maintain a body at equilibriu...

what force will be neccesary to just maintain a body at equilibrium in a body weighing 914.5kg along the horizontal plane

Find out diameter of steel wire, Find out diameter of steel wire: Q: ...

Find out diameter of steel wire: Q: A load of 5 KN is to be raised with help of steel wire. Find out diameter of steel wire, if maximum stress does not to exceed 100 MNm 2

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd