Q. Module Site Installation Preparation?

The following tasks shall be accomplished at the Facility site prior to setting the modules on the piles:

After module support piles have been installed, the cap plate of each pile shall be surveyed to determine the top elevation of the cap plate when flat shim plates are used. Survey each corner of the cap plates when tapered shims are used. Refer to the construction drawings as appropriate, for various site conditions.

The ground between the piles shall be cleared of debris and the entire area shall be levelled as required to suite the placement of module either by crawler, RTVs and/or crane. The Project Site construction support shall obtain from logistics the area and elevation of the ground that needs levelling. In many instances an area in front of RTV or crawler setting the modules must also be levelled.

Posted Date: 7/8/2013 12:51:55 AM | Location : United States







Related Discussions:- Module site installation preparation, Assignment Help, Ask Question on Module site installation preparation, Get Answer, Expert's Help, Module site installation preparation Discussions

Write discussion on Module site installation preparation
Your posts are moderated
Related Questions
Main Features of Laser Cutting Process   1) Laser cut kerf is very narrow resulting in material saving. 2) Has very narrow heat affected zone (HAZ) and therefore gives low

Derive the shape functions N1...N10 for a 10 node triangular element in terms of area coordinates L 1 , L 2 , L 3 .  Nodes are equally spaced on the edges and node 10 is at the cen

Load on beam: A beam AB as shown in the figure given below is hinged at A and supported at B by a vertical cord that passes over two frictionless pulleys C and

(a) Describe a vector and scalar ? (b) What is meant by line of action of vector ? (c) What are displacement vectors and position vector ? (d) Calculate the component of t

what is Otto cycle?

A pump station has been designed to lift water out of a 6 metre deep pit (vented to atmosphere) via a centrifugal pump mounted at ground level. Liquid conditions

#quesThe spring controlled governor of the “Hartung” type has two rotating masses each of 3.5 kg and the limits of their radius of rotation are 100 mm and 125 mm. The each mass is

a) Describe the role of value engineering in new product design and manufacturing. b) Elaborate the basic concept of Just-in-Time in context of optimization of inventory costs.

Method:- Using the two small pipes - Radial Drilling machine First we make a base. Then we attach column to the base. Then show the table atmiddle of the column. Then after we

Write a literature review on the manufacture and application of metallurgical cokes in Nigeria.