Measurement in production system, Mechanical Engineering

Measurement in Production System:

This unit explain the performance measurement in an organisation. More than just a passive means for assessing what has already occurred, the act of measurement serves to motivate specific behaviours and, therefore, predestine future outcomes. In modern times, accounting systems have become the primary means by which organizations track and assess performance. This unit covers the counterproductive influence of traditional systems and performance criteria on long-term organisational competitiveness. This also covers the new worldview of business, the world-class worldview, and the enlightened criteria measures that represent that worldview. Features of performance measurement systems for implementing enlightened measures are discussed as well.

Posted Date: 2/2/2013 2:33:30 AM | Location : United States

Related Discussions:- Measurement in production system, Assignment Help, Ask Question on Measurement in production system, Get Answer, Expert's Help, Measurement in production system Discussions

Write discussion on Measurement in production system
Your posts are moderated
Related Questions
Shear Force and Bending Moment: Shea r Force (S.F.) Algebraic sum of all vertical forces at any section of beam to the right or left of the section is known as shear for

Discover the angle of twist - uniformly varying shaft: A uniformly varying shaft of length 2 m is subjected to a torque of 2 kN-m. The diameter at the ends shall be 60 mm and

A particle is acted upon by a force of constant magnitude which is always perpendicular to the velocity of the particle. The motion of the particle takes place in a plane, then wha

Advantages and Limitations of Adhesive Bonding The description so far might be concluded through listing main advantages of adhesive joints. (a) The adhesive joints assist

Registering a Small Scale Unit: Small Scale and ancillary units (i.e. undertaking with investment in plant and machinery of less than Rs. 6.0 million and Rs. 7.5 million respectiv

winter&summer refrigeration .

why G2 is introduced in michelson interferometer tell with proper diagram

Implementation of Material Requirement Planning: The total requirements for a material from an MRP schedule are given in the following table :