Maintenance of water bound macadam roads, Civil Engineering

Maintenance of Water Bound Macadam Roads:

The maintenance of water bound macadam surface consists of :

  • filling potholes, ruts with additional material and adequately compacting.
  • removing corrugations by dragging.
  • repairing lavelled surface (in which loose aggregates appear on the road) by adding fresh binding material, watering and compacting.
  • restoring broken edges by fresh material.
  • renewal of surface (50-75 mm) once in 2-6 years depending upon traffic.

 

Posted Date: 1/22/2013 5:34:39 AM | Location : United States







Related Discussions:- Maintenance of water bound macadam roads, Assignment Help, Ask Question on Maintenance of water bound macadam roads, Get Answer, Expert's Help, Maintenance of water bound macadam roads Discussions

Write discussion on Maintenance of water bound macadam roads
Your posts are moderated
Related Questions
what is a 1st sort,2nd sort, 3rd sort stone masonary

The local survey crew measures a distance of 1,135 ft of new drainage pipe that is required for the new road construction. The beginning point for the drainage is located at statio

design procedure

Calculate the Number of Paths, Number of Critical Paths and Project Duration For the project network shown, the total number of paths through the network; number of critical pa

• The bar carries equal weights at equal distances from the weight lifter's hands • The reactions (R) at the hands must be equal and opposite to the weights • The pair of for


Q. Constriction of waterway at bridges? Constriction of waterway at bridges is effected by extending the approach banks to cover spill area or, in addition, part of active chan

What is the Design Mix concrete Determination of  the proportions of  cement, aggregates and water to  achieve the required strengths in concrete is made by designing  the  con

collect the field deta manualy and drw the drawing as per scale

Classification Based on Durability: Durability tests are conducted by the forest research establishment. They cover test specimen of size 600 × 50 × 50 mm in the ground to hal