Maintenance of water bound macadam roads, Civil Engineering

Assignment Help:

Maintenance of Water Bound Macadam Roads:

The maintenance of water bound macadam surface consists of :

  • filling potholes, ruts with additional material and adequately compacting.
  • removing corrugations by dragging.
  • repairing lavelled surface (in which loose aggregates appear on the road) by adding fresh binding material, watering and compacting.
  • restoring broken edges by fresh material.
  • renewal of surface (50-75 mm) once in 2-6 years depending upon traffic.

 


Related Discussions:- Maintenance of water bound macadam roads

Auto cad drawing , im looking for someone to do drawing in autocad 3D 2013 ...

im looking for someone to do drawing in autocad 3D 2013 with report

3 wire leveling, can you give me some examples and problems in 3-wire level...

can you give me some examples and problems in 3-wire leveling?

Underwater inspection procedures - inspection of bridge, Explain the Underw...

Explain the Underwater inspection procedures - inspection of bridge? Under-water bridge inspection, especially the initial inspection, requires careful planning to ensure that

Simple bending, In case of simple bending after simply supported beam, deri...

In case of simple bending after simply supported beam, derive that M/I = s /y = E/R.

Estimating, a 45 cm deep roof beam is provided on 30 cm wall of a room size...

a 45 cm deep roof beam is provided on 30 cm wall of a room size 3.0m*5.0m . calculate the quantity of steel required in beam on percentage basis.

Constructed wetland design guidelines, Develop a simple urban constructed w...

Develop a simple urban constructed wetland design guidelines and drawings. Your report should include the following: I. Data required for the design II. Types of constructed

Determine the ruthann graphical method, A retaining wall with a vertical ba...

A retaining wall with a vertical back 5 m high supports cohesion less backfill of unit weight of 19 kN/m 3 . The upper surface of the backfill rises at an angle of 10° with the hor

Comparing speed, Question Comparing speed of "Formwork exceeding 300mm wide...

Question Comparing speed of "Formwork exceeding 300mm wide, horizontal and at any inclination up to and including 5o to horizontal" with speed of "Formwork exceeding 300mm wide, at

Steel, sir i want to know that which pages of IS800:2007 is used for steel ...

sir i want to know that which pages of IS800:2007 is used for steel design of tension member, compression member, collumn, beam, connections, trusses etc.. please give me the topic

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd