Maintenance of Water Bound Macadam Roads:

The maintenance of water bound macadam surface consists of :

  • filling potholes, ruts with additional material and adequately compacting.
  • removing corrugations by dragging.
  • repairing lavelled surface (in which loose aggregates appear on the road) by adding fresh binding material, watering and compacting.
  • restoring broken edges by fresh material.
  • renewal of surface (50-75 mm) once in 2-6 years depending upon traffic.

 

Posted Date: 1/22/2013 5:34:39 AM | Location : United States







Related Discussions:- Maintenance of water bound macadam roads, Assignment Help, Ask Question on Maintenance of water bound macadam roads, Get Answer, Expert's Help, Maintenance of water bound macadam roads Discussions

Write discussion on Maintenance of water bound macadam roads
Your posts are moderated
Related Questions
what do mean by outstand element of compression flange, internal element of compression flange and web general

• Gas turbines produce noise, heat radiation and exhaust gas emissions that are potentially a danger to health • Fuel is flammable and there are hot surfacesand moving parts

Q. Show the Direction of gunning in shotcreting? At the time of the construction of shotcrete, it is intended at gunning the full thickness in one single operation and this hel


Critical Path - Activity on Node The project precedence table shown below provides the relationships and durations of all activities. Based on end-of-day calculations for start

Physical Tests on Cement (a) Soundness Test: by sieve analysis, it is conducted. 100 gms of cement is taken and sieved throughout IS sieve No. 9 for fifteen minutes. Residue on

Define Recommendations for confined elastomeric pad?  (a) Permissible limits for confined pressure on elastomer pad depends upon effectiveness of internal seal preventing it fr

how to draw a parabola

how can I come up with the research on the water bound macadam road construction

describe how quality control is maintained in a rolled fill dam