Comparing speed, Civil Engineering

Assignment Help:

Question
Comparing speed of "Formwork exceeding 300mm wide, horizontal and at any inclination up to and including 5o to horizontal" with speed of "Formwork exceeding 300mm wide, at any partiality more than 85o up to and including 90o to horizontal", which is advanced?

Answer
Item "Formwork exceeding 300mm wide, at any partiality additional than 85o up to and including 90o to horizontal" refers to formwork formed vertically and while compared with formwork erected in horizontal plane, quantity of false work required is lesser.

Item "Formwork exceeding 300mm wide, horizontal, at any inclination up to and including 5o to horizontal" refers to formwork to be vertical in horizontal position and in general it requires much false work to carry this type of formwork. Therefore, speed for this item is advanced than one mentioned in above section.


Related Discussions:- Comparing speed

Stabilization of Black Cotton soil, How the stabilization of black cotton ...

How the stabilization of black cotton soil was done in field? what are the methods to do that?

Can you explain permeable spurs, Q. Can you explain Permeable Spurs? A ...

Q. Can you explain Permeable Spurs? A permeable spur may be constructed by driving two or more rows of bally piles with sufficient penetration below riverbed level to provide a

Define deferred maintenance- underwater inspection of bridge, Define Deferr...

Define Deferred maintenance - underwater inspection of bridge? Many problems of the substructure can be traced to lack of any maintenance in time, which again can be due to lac

Calculate the weight of the soil, Calculate the weight of the soil. Go ...

Calculate the weight of the soil. Go to the first screen. 1. Establish the geometry of the member that you want to design. 2. Each member has to be designed separately.

Plants aeration period, Plants aeration period: Problem: What i...

Plants aeration period: Problem: What is the plant's aeration period? Solution The plant's aeration period is the number of hours that the wastewater is aerated

An alternative test to confirm concrete strength, Question If concrete comp...

Question If concrete compression test not pass, So Schmidt hammer test will be adopted as an alternative test to confirm concrete strength ? Answer Schmidt hammer test is

Enumerate the term - superposing the stress variations, Enumerate the term ...

Enumerate the term - superposing the stress variations If the case of concentric pre-stressing is considered, we can appreciate that stress at any section of the beam is compr

Concrete mix design, Concrete Mix Design: Concrete mix design is done...

Concrete Mix Design: Concrete mix design is done in a laboratory to achieve the desired strength and workability. The mix design is done to achieve strength slightly higher t

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd