QuestionComparing speed of "Formwork exceeding 300mm wide, horizontal and at any inclination up to and including 5o to horizontal" with speed of "Formwork exceeding 300mm wide, at any partiality more than 85o up to and including 90o to horizontal", which is advanced? AnswerItem "Formwork exceeding 300mm wide, at any partiality additional than 85o up to and including 90o to horizontal" refers to formwork formed vertically and while compared with formwork erected in horizontal plane, quantity of false work required is lesser. Item "Formwork exceeding 300mm wide, horizontal, at any inclination up to and including 5o to horizontal" refers to formwork to be vertical in horizontal position and in general it requires much false work to carry this type of formwork. Therefore, speed for this item is advanced than one mentioned in above section.
30,000-yd 3 of banked soil from a borrow pit is stockpiled before being trucked to the jobsite. The soil has 28% swell and shrinkage of 18%. The final volume of the compacted so
Sheet rock cannot be installed in the new house you are building until a building inspector approves the plumbing, electrical, HVAC, and insulation. This is an example of:
State Highways: These are trunk or arterial roads of a state connecting the National Highways of adjacent states and linking the district headquarters and important cities wit
what is stone lime shall lime and kankar lime
State about the Prestressing Steel For prestressed concrete members, the high-tensile steel, used generally, consists of wires, bars or strands. The high tensile strength of s
What is grading modulus?
please tell me about gradation of open graded premix carpet
ellipse construction via foci method
Explain the Statements about the Differential Levelling I. Bench mark (BM) - relatively permanent point of known elevation as indicated on the Contract drawings II. Back s
Attached document
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd