Maximize Z= 3x1 + 2X2
Subject to the constraints:
X1+ X2 = 4
X1 - X2 = 2
X1, X2 = 0
Posted Date: 2/24/2013 3:21:48 AM | Location :







Related Discussions:- lpp using sipmle method, Assignment Help, Ask Question on lpp using sipmle method, Get Answer, Expert's Help, lpp using sipmle method Discussions

Write discussion on lpp using sipmle method
Your posts are moderated
Related Questions
a. What do you mean by linear programming problem? Explain the steps involved in linear programming problem formulation? b. A paper mill produces two grades of paper viz., X and Y.

A paper mill produces two grades of paper viz., X and Y. Because of raw material restrictions, it cannot produce more than 400 tons of grade X paper and 300 tons of grade Y paper i

what happen if line balancing does not exist

A paper mill produces two grades of paper viz., X and Y. Because of raw material restrictions, it cannot produce more than 400 tons of grade X paper and 300 tons of grade Y paper i

Determination of effectiveness Measures: Effectiveness measure is a measure of success of a model in representing a problem and providing a solution. It is the connecting link

Drury's Principles: The basic principle, which still governs the selection of reading material for a library, was enunciated by Drury  in 1930. It states: "To provide the righ

The sequencing problems arises whenever there is problems in determining the sequence ( order) in which a member of tasks can be performed by a number of service facilities su

Demerits a.It cannot  be used in  the case  of  bi variate distribution. b.If the  numbers  of items  are greater than say  30, the calculation becomes  tedious  and  requ


USE SIMPLE METHOD TO SOLVE THE FOLLOWING LPP MAXIMISE Z=4X1+10X2 SUBJECT TO CONSTRAINS, 2X1+X2 2X1+5X2 2X1+3X2 X1, X2>0