linear programming, Operation Research

#questiA paper mill produces two grades of paper viz X and Y. Because of raw material restrictions, it cannot produce more than 400 tons of grade X paper and 300 tons of grade Y paper in a week. There are 160 production hours in a week. It requires 0.20 and 0.40 hours to produce a ton of grade X and Y papers. The mill earns a profit of rs200 and rs 500 per ton of grade X and Y paper respectively. FORMULATE THIS IS A LINEAR PROGRAMMING PROBLEMon..
Posted Date: 2/14/2013 10:22:21 AM | Location : USA







Related Discussions:- linear programming, Assignment Help, Ask Question on linear programming, Get Answer, Expert's Help, linear programming Discussions

Write discussion on linear programming
Your posts are moderated
Related Questions
Six Operators are to be assigned to five jobs with the cost of assignment in Rs. given in the matrix below. Determine the optimal assignment. Which operator will have no assignment

A PAPER MILL PRODUCES TWO GRADES OF PAPER VIZ., X AND Y. BECAUSE OF RAW MATERIAL RESTRICTIONS, IT CANNOT PRODUCE MORE THAN 400 TONS OF GRADE X PAPER AND 300 TONS OF GRADE Y PAPER I

DISCUSS THE SIGNIFICANCE AND SCOPE OF OPERATION RESEARCH IN MODERN MANAGEMENT

history of modi

A DRUG MANUFACTURER produces 2 products X1 and X2.X1 needs 2 hours on machine A AND 2 HOURS ON MACHINE B.X2 needs 3 hours on machine A and 1 hour on machine B.If machine A can run

Model building is the essence of the operations research approaches?

Ask question #Minimum 100 words what can engineer planner do in métallurgie accepted#

Case Study Methods: It is studying the phenomenon event situation or development through a thorough and detailed analysis or intensive study. The case may be an individual a gr

#question.Solve the following Linear Programming Problem using Simple method. Maximize Z= 3x1 + 2X2 Subject to the constraints: X1+ X2 = 4 X1 - X2 = 2 X1, X2 = 0.

G. Ambler has € 10000 available for a second hand car, but would like to buy a fast car that costs € 25000. He needs the money for that car quickly, and would like to increase his