line balancing, Operation Management

what do you understand by “line balancing “? What happens if balance doesn’t exist?
Posted Date: 2/7/2013 3:31:24 AM | Location :





Assembly Line Balancing

Line Balancing and Work Cell Balancing is an efficient tool to increase the output of the Assembly line and Work Cell line to reduce manpower and cost. Assembly Line balancing is nothing though the Simple Line Balancing is the calculation of assigning works to workstation alongside an Assembly Line and that operation will be optima in sense. Henry Ford who was first introduced the Assembly Line Balancing and in early times it was simple line balancing (LB) that has optimized the industrial significance, the effective difference between the optimal and sub-optimal operation can afford savings that will be million dollars every year.

Singe-Model Assembly Line: in early times assembly lines were utilized in high level production of a single product. But now the products will draw customers with no any difference and allows the profitable use of Assembly Lines. An advanced technology of production which enables the automated setup of operations and it is negotiated time and money. One time the product is assembled in the same line and it won’t variant the setup or significant setup and it’s time that is utilized, this assembly system is called as Single Model Line.

LB: it is a Classical Operation Research (OR) which optimizes the problem, and it has been handled by OR for many decades. Several algorithms have been proposed to this problem and it contempt the usual importance of the issue and the OR utilizes to handle this. It’s commercial software which is available to optimize the industry and their lines.

Assembly Line Balancing is dependent upon 3 models and it is explained that these 3 types of models is related to Assembly Line Balancing and they are Single-Model Assembly lines, mixed models, and multi-model Assembly lines.

Multi-Model Assembly Line: in this type of model the uniformity of the assembled products and the production system is not that very much sufficient to accept the enabling of the product and the production levels. To decrease the time and money this assembly is arranged in batches, and this permits the short term lot-sizing issues which made in groups of the models to batches and the result will be on the assembly levels.

Mixed Model Assembly Line: in this model the setup time among the models would be decreased sufficiently and enough to be ignored. Thus this internal mixed model determines the assembled on the same line. And the type of assembly line wherein workers work in different models of a product in similar assembly line is called Mixed Assembly Line.
Posted by John | Posted Date: 2/12/2013 7:31:42 AM


Related Discussions:- line balancing, Assignment Help, Ask Question on line balancing, Get Answer, Expert's Help, line balancing Discussions

Write discussion on line balancing
Your posts are moderated
Related Questions
Explain, in your own words, the relationship between a project network and a project plan. Can a project plan be created without a project network? Why or why not? Provide a specif

It seems common in many of todays workplaces that people dont actually talk to one another frequently. We rely on e-mail, or the even less rich communication channel of text messag

Automated Layout Design Programme or ALDEP Here the closeness relationship between two department is used to build up layout . Computer selects randomly the first facility and

Which of Kotter's 8 steps are critical to sustaining change? (You can list multiple steps.) Why do some change leaders fail to properly address sustaining change?

When qb researchers look in dept. at single situation/when research method are they using/1. Laboratory studies/2. Field studies/3. Case study/4 meta-analysis/ 5.survey studies/ wh

Big Bobs Burger Barn would like to graphically depict the interaction among its lunch- ordering customers and its three employees. Customers come into the restaurant and eat there,

Solve the following Linear Programming Problem using Simple method. Maximize Z= 3x1 + 2X2 Subject to the constraints: X1+ X2 = 4 X1 - X2 = 2 X1, X2 = 0

Leslie Igles is being sent to Ireland as the new manager of a local subsidiary of a U.S. firm. She has a participatory management style and is known for her ability to relate to th

What do you think are the pros and cons of using a web-based appraisal systems?

One group of 20 trainees estimated a total overall monthly cost benefit of $336,000 related to business improvements and showed an average 70 percent confidence level with that est