LEED, Civil Engineering

Need this assignment due in 10 hours
Posted Date: 10/19/2014 6:11:20 PM | Location : United States







Related Discussions:- LEED, Assignment Help, Ask Question on LEED, Get Answer, Expert's Help, LEED Discussions

Write discussion on LEED
Your posts are moderated
Related Questions
Explain Chezy Manning Equation v = 1.49/n (R) 0.67 (S) 0.5     R = hydraulic radius (ft) = Area/ wetted perimeter, R = D/4 for circular channels full and one-half full

Could someone please help me with the calculations of determining the sfd & bmd for cantilevers with udl''s, lvl''s and point loads? Also could I please have the same for ssb with


What are different type of foundation and their suitablity

defference between direct and indirect ranging..

Determine the term -  lowering of stresses Due to creep of concrete, these compressive strains keep on increasing with time. it means that the length of the member keeps on red

Q. What do you mean by M A S Accounts? This stands for material at site account. This is a suspense head of account that is maintained to watch actual consumption of materials

i want to just understand civil eng main points of all subjects which i becam able to tell some body about this tha what is this ?

Classification Based on Grading: IS 883-1970 classifies the structural timber into 3 grades-select grade, grade I and grade II. The classification is depend on, defects, permi

the importance of softening point of a bitumen material in the design of a pavement