LEED, Civil Engineering

Need this assignment due in 10 hours
Posted Date: 10/19/2014 6:11:20 PM | Location : United States







Related Discussions:- LEED, Assignment Help, Ask Question on LEED, Get Answer, Expert's Help, LEED Discussions

Write discussion on LEED
Your posts are moderated
Related Questions
Edge piles take up more loads than central piles in rigid cap Because of the effect of interaction of individual piles, central piles tend to settle more than the edge piles w

I am M tech in civil engg looking for online assignment job.

Question In search reclamation, what are considerations in choosing between trailer suction hopper dredgers and grab dredgers ? Answer Trailer suction hopper dred

1. The topography of a local valley is shown. The horizontal distance between point P and Q is 11,456-ft. The percent grade (%) of line P-Q .     2. Based on the info

A 70-ft long, ¾" diameter, 6 x 7 FC wire rope is resisting a tension force of 12-kips.  The elastic stretch of the steel wire rope given the following properties is most nearly: E

Q If the degree of curve is defined by the angle at the center subtended by an arc (or chord) 20 meters, find the length of the chord in meters so that the versine measured in cm

I would like to ask what is regression and its function?

Breakwater and its types

Maintenance of Earth Roads: The main task in maintaining the earth road is to ensure that cross-section is intact and is free from rutting, depressions and corrugations, and

What you need to do in my assignment only for the calculation part for project Task CalculateSG A: Ground Level, SG B: First Level, SG C: Second > Level, SG D: Third Level, and Su