Is codes for building materials and construction, Civil Engineering

IS CODES FOR BUILDING MATERIALS AND CONSTRUCTION

The following is the list of some of the IS code giving requirements for building materials: IS 269-1989. Specification for ordinary portland cement.

IS 455-1989. Specification for portland slag cement.

IS 516-1959.  Method of tests for strength of concrete.

IS 1123-1975. Method of recognition of natural building stones.

IS 383-1970. Specifications for fine and coarse aggregates.

IS 432-1982. Specification for mild steel.

IS 3495-1976. Gives specifications for building bricks.

IS 287-1973. Gives maximum permissible moisture content in timber for different uses and for different zone.

Posted Date: 10/22/2012 6:26:13 AM | Location : United States







Related Discussions:- Is codes for building materials and construction, Assignment Help, Ask Question on Is codes for building materials and construction, Get Answer, Expert's Help, Is codes for building materials and construction Discussions

Write discussion on Is codes for building materials and construction
Your posts are moderated
Related Questions
Ask question #Minimum 100 words accepte d#

A retaining wall, 6 m high, retains dry sand with an angle of friction of 30° and unit weight of 16.2 kN/m 3 . Verify the earth pressure at rest. If the water table rises to the to

Question Is it true that rational process has to not be used for large catchments in estimating peak runoff ? Answer Rational process is appropriate for small catchme


A tank with vertical sides contain 3m of water in the bottom, overlain by 4m of oil with no intermixing. Draw pressure diagram due to the oil and water on one of the tank sides and

Explain the concept of average velocity

A piece of clay taken from a sampling tube has a wet weight of 1.553 N and volume of 95.3 cm 3 . After drying in an oven for 24 hours at 105°C, its weight 1.087 N. Suppose the spec

Explain Situations that warrant a damage inspection? - Floods - bridges located in streams, rivers and other waterways with known or suspected scour potential. - Build-up of

Q. One-way pre stressing vs two-way pre stressing? At the time of pre-stressing operation at one end, frictional losses will take place and the prestressing force decreases alo

Determine the minimum speed of the stunt rider, so that when he leaves the ramp at A he passes through the center of the hoop at B. [5 Points] 2. How far h should the landing ramp