High level architecture, Software Engineering

Devise an architecture for a system that manages the daily operation of a motor vehicle service and repair business. The system will have the following functionality:-
Administration staff make a service booking for a customer at a time and date for a service/repair job, using a workstation in the office.
Mechanics log time and parts used against the customer''s job using a workstation in the workshop.
A stock is kept of commonly used parts and materials. The system keeps track of current inventory and re-orders automatically as needed. The system will also place a one-off order with a supplier when an uncommonly used part is need for a job.
Customer job records are held for future reference, and to be able to automatically email customers with a reminder that service is due at fixed intervals.
Posted Date: 10/17/2012 1:27:52 AM | Location : United States







Related Discussions:- High level architecture, Assignment Help, Ask Question on High level architecture, Get Answer, Expert's Help, High level architecture Discussions

Write discussion on High level architecture
Your posts are moderated
Related Questions
Advantage of microcomputer software packages: i)  compilation and maintenance of reference and fact files;  ii)  compilation of current and retrospective bibliographies

Difference between Pilot and Beta Testing. Pilot testing includes having a group of end users try the system prior to its full deployment in order to give feedback on its perfo

compare and contrast the advantages of verticle and horizontal structural partitioning?

Q. Briefly explain Integration Testing? Integration Testing: In this the module are methodically integrated and tested to find protocol design error, interface problems, errors

Q. What is requirement elicitation methods? Subsequent to receiving the problem statement from the customer the first step is to arrange a meeting with the customer. During the

Importance of function point:    This is independent of the languages tools, or methodology used for execution. They can be estimated from requirement specification or desig

Q. Draw the flow chart of Risk Management-Activity and explain various Software risks. Ans RISK is a problem that could cause a few loss or threatens the success of the proje

What is SCI? Software Configuration Item is in order that is carried as part of the software engineering process.

A player with an active turn must make a valid move with their character or pass their turn. As a first move in the game, the player can move to the hallway that is adjacent to the

cause effect testing