ISO 9001 and CMM:

1:  Management responsibility

2: Document control

3: Purchasing

4: Training

5:  Internal quality audit

 


Related Discussions:- Iso 9001 and cmm

What is waterfall model, Waterfall is a model of the software development p...

Waterfall is a model of the software development process in which the idea phase, requirements phase, design phase, execution phase, test phase, installation phase, and checkout ph

what is random testing, What is Random Testing? This is one of process...

What is Random Testing? This is one of process used to exercise a class. It is based on developing a random test series that tries the minimum number of operations typical to th

Define function point, What is function point? Function point measures...

What is function point? Function point measures the functionality from the user point of view, that is, on the basis of what the user request and receives in return. Therefore

Distinguish software faults and software failures, Q  Distinguish software ...

Q  Distinguish software faults and software failures? Ans: In case of a failure a software doesn't do what the users expect, a fault is a programming bug that may or mayn't act

Need of output comparators, Q. Need of Output comparators? Output comp...

Q. Need of Output comparators? Output comparators These are used in dynamic testing-both single-module and multiple-module (system level) varieties to check that predicted an

Define quality control, Explain Quality control This includes checking ...

Explain Quality control This includes checking the software development process to make sure that procedures and standards are being followed. There are two approaches to qu

What is requirement traceability, What is Requirement Traceability? Explain...

What is Requirement Traceability? Explain its importance. Requirement Traceability is mapping of needs to test cases. There are two major traceability: Forward and Backward. It

Calculate the peak manning time, Q. Consider a project for which the manpow...

Q. Consider a project for which the manpower requirement is 200 PY and the development time is 2 years. calculate the peak manning time. Ans Software Project cost K=200 PY

What is bottom-up testing, Bottom-up testing is a method of integration tes...

Bottom-up testing is a method of integration testing. A test engineer makes and uses test drivers for components that have not yet been developed, because, with bottom-up testing,

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd