Hardware and software requirements - cds - isis software, Software Engineering

Assignment Help:

Hardware and Software Requirements:

The present versions of CDS/ISIS require the following minimum hardware and software: 

i)  MS-DOS Version: an IBM PC or Compatible microcomputer with a minimum of 640 K RAM, 2 MB hard disk and a 3 1/2 inch high density D) diskette unit,  

ii)  UNIX Version : An Intel 386/486 processor, a 31 /2 HD diskette unit, operating System V, release 3 or higher (or SCO), VT 100 or compatible terminals and peripherals like printer, 

iii) Windows Version : An Intel Pentium processor, at 16 NIB RAM, 10 MB hard disk space and a 3 1/2 inch HD diskette unit, Windows 3X or Windows 95 operating system. 

As a result of a strategic development policy enunciated by Unesco, it was decided to completely rewrite the CDS/ISIS software in C++ in order to provide a common standardised language for all its versions. This effort resulted in reducing maintenance costs of different versions of CDS/ISIS. Also, this helps in the adoption of a multi-platform software development system in order to increase the level of portability to different hardware as well as operating systems. In other words the present change results in the portability level being increased to cover a range of hardware from stand alone PC's to powerful mini-computers. This obviously leads to the implementation of a Client Server architecture using market standard interfaces.  


Related Discussions:- Hardware and software requirements - cds - isis software

December 2010, differentiate between structured analysis and structured des...

differentiate between structured analysis and structured design

What is a state transition diagram, What is a state transition diagram? ...

What is a state transition diagram? State transition diagram is basically a collection of states and events. The events cause the system to change its state. It also show what

Explain sci, What is SCI? Software Configuration Item is information th...

What is SCI? Software Configuration Item is information that is carried as part of the software engineering process.

What are interrupts, What are interrupts In a microprocessor system, th...

What are interrupts In a microprocessor system, there are three main types of interrupt that cause a break in the normal implementing of a program

Software engineer, Differance b/w Liner sequenrial modal with incremental m...

Differance b/w Liner sequenrial modal with incremental modal

What is recovery/error testing, Recovery/error testing is testing how well ...

Recovery/error testing is testing how well a system recovers from crashes, hardware failures, or other catastrophic problems.

Three generic phases of software engineering, What are the three generic ph...

What are the three generic phases of software engineering a) Definition, b) development, c) support

Project or process, Mentoring a class at a university. is project or proce...

Mentoring a class at a university. is project or process??

Software licence, main characteristics of software lease

main characteristics of software lease

What are the aims of analysis modelling, What are the aims of Analysis mode...

What are the aims of Analysis modelling? i. To make apparent what the customer wants. ii. To set up a basis for the creation of software design. iii. To devise a set of v

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd