Q. Granite Tiles for construction material?

At every important station for public urinals granite may be used as wall cladding drain and foot rest material. The water sinks at water points may be provided with granite lining at very important station counters for Booking windows at every important stations can be done up with granite slab.


Related Discussions:- Granite tiles for construction material

Asphalt mix design – durability and stability, Q. Asphalt mix design - dura...

Q. Asphalt mix design - durability vs. stability? The main aim of asphalt mix design is to achieve a mix with economical blending of aggregates with asphalt to achieve the foll

Explain the perception reaction time, Explain the Perception Reaction Time ...

Explain the Perception Reaction Time A significant variable in the successful processing and use of information is the speed with which this is done. Perception-Reaction Time (

Determine the axial strength of the plates in direct tension, The two plate...

The two plates shown below are each 10-in. wide by ¾- in. thick. The gage distance, g, and the longitudinal spacing on each member is set at 4-in. Determine the axial strength of t

Rcc, what is the density of rcc

what is the density of rcc

Explain the maximum spacing of piles, Q. Explain the Maximum spacing of pil...

Q. Explain the Maximum spacing of piles? One of the factors which affect the distribution of loads from the structures to each pile is assumption of flexibility of the pile ca

Effect of rusting on steel reinforcement, Effect of rusting on steel reinfo...

Effect of rusting on steel reinforcement Corrosion of steel reinforcement inside a concrete structure is undesirable in the subsequent ways:  (i)  Presence of rust impairs

Tests on bricks, Tests on Bricks The following laboratory tests can be...

Tests on Bricks The following laboratory tests can be conducted on the bricks to find their suitability: 1.    Crushing strength 2.    Absorption 3.    Shape and size

Length is constructed in first phase of construction, In construction of a ...

In construction of a two-span bridge (span length = L) by using span-by-span construction, why is the length of about 1.25L bridge segment is constructed in first phase of construc

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd