Explain the various modes in which DMAC works.
Working of Direct memory access controller:
The modes of operation has demand mode, block mode, single mode and cascade mode. Demand mode transfers data till an external EOP is input or till the DREQ input becomes inactive. Particular mode releases the HOLD after all byte of data transferred. Block mode automatically transfers the no. of bytes specified by the county register for the channel. Cascade mode is used while more than one 8237 is present into a system.
XTHL Exchange top of the stack with HL Instruction The contents of top two location of the stack are exchanged with the contents of HL register pair. The contents of reg
Q. The radiation pattern of a half-wave dipole antenna is given by (a) Sketch the radiation pattern in the principal plane of xz containing angle θ. (b) Determine the beam wi
1. For the flyback converter operating in the discontinuous "current" (flux) mode, derive an expression for the time at which the magnetizing current returns to zero. 2. A forwa
Design and draw a circuit using the cascade system to operate two cylinders (A and B) which, on the operation of a start valve, produces the sequence A - B + B - A+. The cylinder
Mode 1 ( 0 By applying a positive output pulse of the pulse width modulator to the transistor Q 1 it gets turned on. An input current in flows through V in Q 1
Define Shunt Capacitors and Reactors Shunt capacitors absorb leading VArs (i.e. they are used to supply lagging VArs) whereas reactors are used to absorbs lagging VArs. Capacit
applications of dynamically induced emf
The one line diagram of a simple power system is shown below. The data of the system are given in the table below. (a) Draw the impedance diagram of the system and mark all impe
Activities to Preparing Long-term Plans 1. Data collection regarding existing loads, forecast of expected loads, operating conditions, and etc. from Grid substation up to cons
Example of clamper circuits: Example of clamper circuits are as follow Voltage multiplier circuit: voltage circuit is employed to maintain a relatively low transformer pe
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd