Explain the perception reaction time, Civil Engineering

Assignment Help:

Explain the Perception Reaction Time

A significant variable in the successful processing and use of information is the speed with which this is done. Perception-Reaction Time (PRT) is a human factor often cited by traffic engineers concerned with safety. PRT is "the interval between the appearance of some object or condition in the driver's field of view and the initiation of a response" such as braking or changing course. Note that PRT involves the initiation of a response (e.g. pressing the brake), not the completion of the vehicle maneuver (stopping).

PRT depends on the situation. Response time is generally quickest when there is one specific response to be made to a single stimulus (brake lights of vehicle ahead). In the case of "choice reaction time," in which there is more than one stimulus and/or more than one possible response (e.g. toll plaza), reaction time increases as a function of the number of possibilities. A driver may, for example, have to decide whether to steer or brake, or both, to avoid a pedestrian. The PRT used for design standards by AASHTO includes 1.5 sec for perception and decision, 1.0 sec for making a response, for a total of 2.5 sec, which is generally considered adequate for all but the most complex driving situations.


Related Discussions:- Explain the perception reaction time

Ground water, Two pumping wells 1,000 m away fully penetrate the same confi...

Two pumping wells 1,000 m away fully penetrate the same confined aquifer. One of the wells pumps at a rate of 1,240 m3/day. The second well pumps at 850 m3/day. If the aquifer has

Define surface water treatment rule (swtr), Define Surface Water Treatment ...

Define Surface Water Treatment Rule (SWTR) SWTR sets forth primary drinking water regulations requiring treatment of surface water supplies or groundwater supplies under the di

Epoxy-coated bars vs galvanized bars, Bonding performance to concrete: Epox...

Bonding performance to concrete: Epoxy-coated bars vs. galvanized bars  Based on the findings of CEB Bulletin 211 the bonding of galvanized bars to concrete is lower in early

Diaphragms necessary in concrete box girder bridges, Are diaphragms necessa...

Are diaphragms necessary in designing of concrete box girder bridges ?

Explain the activitated sludge (aeration tank), Explain the Activitated Slu...

Explain the Activitated Sludge (Aeration Tank)? The activated sludge treatment process is a biochemical oxidation process. Organic solids are stabilized through the oxidation p

Dissimilarity in methods of compaction, Question Are there any dissimil...

Question Are there any dissimilarity in methods of compaction between clayey soil material and sandy material ? Answer The three key actions of compaction are static

Survey chain, describe gunters chain in survey

describe gunters chain in survey

Water-bound macadam road construction for unpaved roads, how can I come up ...

how can I come up with the research on the water bound macadam road construction

Road base and base course in flexible carriageway, Road base vs. base cours...

Road base vs. base course in flexible carriageway Roadbase is the most significant structural layer in bituminous pavement. It's designed to take up the function of distributi

Determine the meaning of relaxation of steel, Determine the meaning of Rela...

Determine the meaning of Relaxation of Steel If the strain in steel is kept constant, it is seen that stresses in it reduce with time. It is called as relaxation of steel. Ten

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd