Explain the geophysical methods, Civil Engineering

Assignment Help:

Why are undisturbed samples needed? Describe any one procedure of obtaining undisturbed samples for a multi-storeyed building project.

For what purpose are geophysical methods used?

Define any one method

 


Related Discussions:- Explain the geophysical methods

Project data , finding the mean ,mode and mediam

finding the mean ,mode and mediam

Show the excessive movement joints in bridges, Q. Show the Excessive moveme...

Q. Show the Excessive movement joints in bridges? Movement joints are generally added to bridge structures to accommodate movements because of dimensional changes arising from

Major ways to undertake negative skin friction, Question What are major...

Question What are major ways to undertake negative skin friction ? Answer (i) Utilize slender pile sections since smaller pile area when subject to same working load

Explain subcritical flow and supercritical flow, Explain Subcritical flow a...

Explain Subcritical flow and Supercritical flow Subcritical flow: The depth of flow is greater than critical depth and the velocity of the fluid is slow. Also termed "tranquil"

Back fill behind the abutments of bridges, Q. Back fill behind the abutment...

Q. Back fill behind the abutments of bridges? Dry Rubble - At the bank of all bridge abutments and wing walls, the space next to the masonry is to be filled in by a hand-pack

Calculate the uniform pressure on the soil, The plan of a proposed spoil he...

The plan of a proposed spoil heap is shown in Fig. The heap will stand on a thick deposit of soft clay with E-value 15 MN/m 2 . The uniform pressure on the soil may be suppose as 1

Soil compaction, Soil Compaction: Soils used in road construction nee...

Soil Compaction: Soils used in road construction need to be thoroughly rolled and compacted. Compaction of soil is needed for the following reasons. (a) A well compacted s

Determine the coefficient of compressibility, A saturated clay layer 4 m th...

A saturated clay layer 4 m thick is located 6 m below GL. The void ratio of the clay is 1.0. When a raft foundation is located at 2 m below GL, the stresses at the top and bottom o

Unloaded propped, Ask questa) In an unloaded propped cantilever, the proppe...

Ask questa) In an unloaded propped cantilever, the propped end sinks vertically relative to the fixed end by an amount ? due to poor construction of the foundation of the prop. Wha

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd