Explain cutting speed - cutting parameters, Mechanical Engineering

Assignment Help:

Explain Cutting Speed - Cutting Parameters

  • It is relative speed (V1) between wheel and the Work piece.
  • It is expressed in m/sec.

 

V=Cutting speed=V1 

=πDN1/1000 × 60

Where D=Diameter of grinding wheel in mm.

N1=Speed of wheel in R.P.M.


Related Discussions:- Explain cutting speed - cutting parameters

What do you mean by levelling procedure, Q. What do you mean by Levelling P...

Q. What do you mean by Levelling Procedure? The Surveyor shall calculate required field adjustment in module elevation based on data from survey in conjunction with correspondi

Process to establish standard time for completion of a job, a) What is meth...

a) What is method study. Define various stages of method study. b) What are main techniques used to study path of movement in method study. a) Discuss the process to establis

Jig and fixture, design summarised of milling fixture

design summarised of milling fixture

Maximum slope and maximum deflection, Maximum slope and maximum deflection:...

Maximum slope and maximum deflection: A simply supported beam of span l is subjected to two concentrated loads at one-third span through two supports. Discover the maximum slo

The parts and design of the pocket amp, The problem: - Deaf blind peop...

The problem: - Deaf blind people have a huge problem when crossing the streets. They always need assistance from a sighted person or a trained dog to cross the street. There i

Aeronautical engineering, Aeronautical engineering is a branch of aerospace...

Aeronautical engineering is a branch of aerospace engineering, thus some people use the 2 terms interchangeably. It is also sometimes considered that aeronautical engineering cover

First law of thermodynamics, common formula for first law of thermodynamics...

common formula for first law of thermodynamics #Minimum 100 words accepted#

How to create the solid models, Creating 3-d solid models Two basic app...

Creating 3-d solid models Two basic approaches to create solid models are :    (i)  Constructive solid geometry (CSG or c-rep), and (ii)  Boundary representation (b-rep).

Subcontractor submittals, The Supplier/Subcontractor shall submit, for acce...

The Supplier/Subcontractor shall submit, for acceptance, their Material Traceability and PMI program and procedures, which shall comply with this specification, prior to the sourci

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd