Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
In a double acting vertical steam engine running at speed of 360 r.p.m., cylinder diameter is 25 cm, stroke is 30 cm, diameter of piston rod is about 3.75 cm and length of the connecting rod is 60 cm. When the crank has moved 120o from T.D.C., the pressure of steam at cover end is 35 x 104 N/m2. and at crank end is 3 x 104 N/m2. if the mass of the reciprocating parts is 45 Kg evaluate :
(iv) Piston effect
(v) Turning moment on the crank shaft for the given crank position.
WHAT IS LOAD CARRYING CAPACITY ISMB 250 OF 1.2 MTR LENGTH. PL REPLY
what is work?
The steam that leaves the super-heater is expanded from 130bar at 535°C to 25.2bar at 310°C in a high pressure turbine. The steam from the exit of the HP turbine is reheated to 535
State about the Computer-aided design Computer-aided design (CAD), high-quality character fonts, data plots, and artists' sketches all contain smooth curves and surfaces. The pa
Single Cylinder Vertical Engine has a bore of 30cm and a stroke of 40cm. The connecting rod is 100cm long. The mass of the reciprocating parts is 140Kg on the expansion stroke with
Strain energy stored in a body due to impact load
Standard for External Representation of Product Data (STEP) The furthest developed standard is by ISO 10303, or STEP, Standard for the Exchange of Product model data. One of t
Research on Best air pressure : Once we had green light to go on with sand blasting process. We had conducted a few experiment testing and analysis. First of all we
Scope of the angle radial drilling machine There are many scope of the angle radial drilling machine like as: we shell produce a hole at any angle with help
Ignition System: The ignition system is a source and a means of initial spark required to start burning of fuel. A very high voltage supplied at the spark plug tip causes this spa
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd