Engineering drawing, Civil Engineering

parabola by offset method
Posted Date: 3/9/2013 6:55:17 AM | Location : Pakistan







Related Discussions:- Engineering drawing, Assignment Help, Ask Question on Engineering drawing, Get Answer, Expert's Help, Engineering drawing Discussions

Write discussion on Engineering drawing
Your posts are moderated
Related Questions
Question What is meaning of driving succession of driven piles? Answer In Basement construction, if piles are driven from centre to perimeter, there is a propensity o

Classification Based on Mode of Growth: On the basis of mode of growth trees are classified as (a) Exogeneous and (b) Endogeneous (a) Exogeneous Trees: These trees grow outwa

A retaining wall 9 m high retains cohesion less soil, with an angle of internal friction 33°. The surface is level with the top of the wall. The unit weight of the top 3 m of the f


Road Maintenance: Importance of Road Maintenance Roads deteriorate in their condition due to traffic, rain, snowfall and temperature variations. They requirement to b

Compaction to freshly placed concrete piles  In general practice, reliance is placed on the self-compaction of particularly designed concrete mixes to achieve adequate compact


Overview   A structure is required to support a conveyor and various ancillary equipment, between two buildings in an industrial area. It is 12m long and made up of structural s

Which of the following stress-strain curves represents a soft and weak material?   Solution: As depicted, stress is on the y-axis while the x-axis represents strain.Whe

meaning of culverts