Docks, Civil Engineering

Assignment Help:

DOCKS:

Types of Docks

Docks are artificial enclosures for the reception of ships. Three types of docks are found :

(a)        Harbour Docks, or Wet Docks, which are enclosed and are sheltered basins.

(b)       Repair Docks, or Dry Docks where ships are repaired.

(c)        Floating Dry Docks, which are structures which can be depressed and lifted and rendered dry for repair of ships in the open ocean.


Related Discussions:- Docks

Landing stages - water transportation, Landing Stages: A landing stage...

Landing Stages: A landing stage is a floating structure, usually a pontoon or a barge, which is secured to the shore by mooring chains. Small ships can dock against the landin

Design a sanitary branch sewer, Q. For what capacity would you design a san...

Q. For what capacity would you design a sanitary branch sewer to serve a section having a population of 12500 persons with a rate of supply of 135 Liters. Ans.- Average flow

Sketch typical complete grain-size distribution curves, Sketch typical comp...

Sketch typical complete grain-size distribution curves for (i) well graded soil and (ii) uniform silty sand. Form the curves, evaluate the uniformity coefficient and effective size

Explain plate jig, Explain Plate jig 1) The major parts of this jig is ...

Explain Plate jig 1) The major parts of this jig is plate from which it takes its name other necessary parts and drill bush and locating pins. 2) Plate jigs are general for

State the laws governing compaction of cohesion less soils, a) What are th...

a) What are the laws governing compaction of (i) cohesion less soils like sand and (ii) moderately cohesive soils like sandy clay ? b) To what compaction pressure does the

Maintenance of gravel roads, Maintenance of Gravel Roads: The mainten...

Maintenance of Gravel Roads: The maintenance consists of : filling up of potholes/depressions with fresh gravel and compacting after light sprinkling with water. g

Define bank volume to be stockpiled and used for backfill, An earthwork con...

An earthwork contract was awarded to excavate and backfill the foundation of a proposed 50-ft by 50-ft office building.  The existing grade elevation is 437.5-ft while the sub-base

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd