Difference between upstream and downstream in a refinery, Mechanical Engineering

Assignment Help:

The total process of a the refining business begins at the oil field or gas field and runs all the way to the sending of processed hydrocarbon to a final user.

Upstream applies to the operation of exploration, drilling, hydrocarbon production, and transmission via truck, rail or ship or pipeline to the refinery intake valve.

Downstream includes all work completed at the refinery, distillation, cracking, reforming, blending storage, mixing and shipping.

 


Related Discussions:- Difference between upstream and downstream in a refinery

Determine the flow rate - material balances, 1. A continuous steady-state p...

1. A continuous steady-state process involving components A, B, and C is shown below, along with the known process information a) On the flowchart, assign variables for the unkn

Explain sulphidation process, Q. Explain Sulphidation process? The pres...

Q. Explain Sulphidation process? The presence of sulphur converts the surface of the metal to a sulphide scale which is generally more destructive than an oxide scale. Sulphid

Define leakage flux. , Leakage flux : The flux that links the ...

Leakage flux : The flux that links the coil only partially passes through the core does not link the coil as the moving or rotating device is called leakage flux.

Carbon and graphite, Carbon and Graphite Both are excellent refractory...

Carbon and Graphite Both are excellent refractory materials but with good grace oxidize and thus are used merely either in neutral or reducing conditions. Graphite is more sta

Direct stress, diff.between direct stress and bending stress

diff.between direct stress and bending stress

Competency statements , COMPETENCY STATEMENT:  In this programme, every le...

COMPETENCY STATEMENT:  In this programme, every learner shall be assessed on a continuous basis for his/her knowledge and skills during the programme duration. Learners' competenc

Find out the amount of energy spent, Find out the amount of energy spent: ...

Find out the amount of energy spent: 6 cubic metre of water is to be lifted to a height of 40 metres and delivered having velocity of 4 metres/sec. If this operation takes 12

Screw jack, give equivalence of screw jack and friction on an inclined plan...

give equivalence of screw jack and friction on an inclined plane

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd