Determine the Depth of Exploration

The depth of exploration depends on the following factors:

i) Size, type of the structure and loading intensity.

ii) Design considerations such as safety against foundation failure, seepage, earth pressure, excessive settlement.

iii) Character and sequence of sub-soil conditions.

The bore hole/boring must penetrate through all the deposits which are not suitable for foundation. In other words, the bore hole should extend upto strata, which is of adequate bearing capacity. You can use the geophysical profile to estimate the depth of boring.

In the absence of geophysical profile the depth of boring can also be estimated based on stress distribution criteria. This must include all the strata which are likely to undergo settlements due to load of the structure. This depth is called significant depth. De Beer recommends that the increase in stresses at the needed minimum depth of exploration should not exceed by 10% of the original vertical stress or less than 5% of the effective stress in the soil at this depth.

You must always keep in the mind that this significant depth will not account for coefficient of compressibility of the strata.

 

Posted Date: 9/3/2013 5:39:16 AM | Location : United States







Related Discussions:- Determine the depth of exploration, Assignment Help, Ask Question on Determine the depth of exploration, Get Answer, Expert's Help, Determine the depth of exploration Discussions

Write discussion on Determine the depth of exploration
Your posts are moderated
Related Questions
Explain the term - Characteristic Strength The strength of  a material below which not more than 5 percent results are expected to fall is considered as the characteristic stre

A box caisson, 10 m high, is 18 m × 9 m at the base. The weight of the caisson is 9 MN and its centre of gravity is 4.2 m above the base. Check whether the Caisson is stable. If

Question In marine pile type of steel tubular piles with reinforced concrete infill, least toe level is frequently specified in contract drawings. What is the purpose in your v

discuss various chemical reactions involved in lime soda process ?


Estimate the Activity Durations The total labor cost for emergency bridge rehabilitation on an interstate highway is $5,716,440.  The average crew-hour cost is $15,879 for this

types of cement

pert disadvantages of software support, datacollection , interpretation of results issues

uses of timber in civil engineering field and its physical state and chemical formula or symbol?

Ask questiPermanent Way:on #Minimum 100 words accepted#