Determine about the statement - failure at cracking load, Civil Engineering

Assignment Help:

Determine about the statement - Failure at Cracking Load

This brittle mode of failure is likely to occur in those pre-stressed elements that are concentrically pre-stressed with small amounts of  steel. In such cases, the cracking load may be higher than the ultimate load. This type of failure may occur in hollow or solid pre-stressed concrete elements with small amount of  steel.

 


Related Discussions:- Determine about the statement - failure at cracking load

What do you mean by manhole loss, Q. What do you mean by Manhole loss? ...

Q. What do you mean by Manhole loss? Manholes are provided in locations where there are changes in direction, size and gradient of gravity pipelines. Generally practice for str

Determine the flow area of storm water, Storm water flows at a depth of 4 f...

Storm water flows at a depth of 4 ft in the natural channel as shown in the figure. The channel has a slope of 0.0l ft/ft and n = 0.025. 1. Determine the flow area:

Explain hardness - water softening, Explain Hardness - Water Softening ...

Explain Hardness - Water Softening 1) Hardness is used to characterize a water that does not lather well, causes a scum in the bath tub and leaves hard, white, crusty deposits

Explain situations that warrant a damage inspection, Explain Situations tha...

Explain Situations that warrant a damage inspection? - Floods - bridges located in streams, rivers and other waterways with known or suspected scour potential. - Build-up of

Methods of contouring by grid points, the elevations of grid points for an ...

the elevations of grid points for an area as follows: 1 2 3 4 5 6 7 8 F 690 709 726 732 735 740 743 747 E 696 715 729 736 740 737 739 740 D 702 723 733 742 737 737 745 747 C 707 72

Necessity of pile tip cover for rock-socketed H-piles, Q. Necessity of pile...

Q. Necessity of pile tip cover for rock-socketed H-piles? In current practice concrete cover is generally provided at the pile tips of pre-bored H-piles socketed in rock. The o

Assignment, Need assignment for structure concrete work

Need assignment for structure concrete work

State average increase of pressure in the clay stratum, A building was to b...

A building was to be constructed on a clay stratum. Preliminary analysis showed a settlement of 60 mm in 6 years and an ultimate settlement of 250 mm. The average enhance of pressu

Classification of bricks, Bricks may be broadly classified as following: ...

Bricks may be broadly classified as following: Paving bricks Building bricks Special bricks A.   Fire bricks B.   Building Bricks: These bricks are utilized fo

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd