Design of the plc ladder and profibus - asi network, Mechanical Engineering

1 Prepare an updated sketch of the electro-hydraulic system shown in Figure showing the actuators in their start position appropriate to your allocated actuator sequence.

2 By utilising relevant labels and Profibus addresses, prepare a sketch of an appropriate ASI/Profibus (DP) topology supporting two independent ASI networks and show how you would allocate 4I/4O slave modules to your ASI/Profibus(DP) network in order to accommodate the actuators, sensors and Profibus Addresses for two electro-hydraulic sub-systems. Note: The ASI slave modules you've been allocated are shown in Table (1) Note: Assume THREE 8-bit Input Cards and TWO 8-bit Output Cards have been centrally assigned to the PLC for switch control and LED indicator purposes respectively

3 Using the switching functions you prepared in Assignment (1) and the actuator/sensor labels and Profibus addresses you have proposed in Section 2.2 for the two sub-systems, prepare two handwritten drawings of Siemens PLC ladder diagrams capable of producing the required control with one sub-system being assigned to each ASI Network.

4 Show how you would modify your ladder diagrams in Section 3 to include the following additional control requirements shown in Table (1) using Timers (T1 and T2) and Counter (C1) as appropriate where:

(i) Timer T1 provides a 30 second delay and T2 provides a 1.5 minute delay.

(ii) Each sub-system will be required to undertake 4 complete cycles using counter C1 and can only be reactivated by the associated manual START button.

Posted Date: 2/20/2013 1:47:16 AM | Location : United States







Related Discussions:- Design of the plc ladder and profibus - asi network, Assignment Help, Ask Question on Design of the plc ladder and profibus - asi network, Get Answer, Expert's Help, Design of the plc ladder and profibus - asi network Discussions

Write discussion on Design of the plc ladder and profibus - asi network
Your posts are moderated
Related Questions
Parts of Motorcycle Figure: Right Side View of a Motorcycle 12 Part No. Name Functions 1 Muffler he

Plant level - Safety Organization This level works at plant level and would directly report to general manager safety. There must be four plant safety managers as recognized

A combined cycle plant is designed to develop 200MW power. The air is obtained by the compressor at 300K and 1 bar pressure. The maximum temperature of the gas turbine cycle is lim

PRINCIPLE OF SUBMERGED ARC WELDING In submerged arc welding, the arc zone is submerged beneath the molten flux and hence there is no visible signature of the arc. Welding current

SHIELDING GASES Shielding gas is directed by the torch to the arc and weld pool to protect the electrode and the molten weld metal from atmospheric contamination.  Argon

#question.types images.

Q. Show Prevailing wind conditions for plant layout? Prevailing wind conditions influence the design considerations for the location of the flare or vent stack. It is vital tha

A semi circular frame of flexural rigidity EI is built at A and caries a vertical load W at B. calculate the magnitude of the vertical and horizontal deflection at B and hence the

a) Describe Industrial Engineering. Discuss its scope and use in service and manufacturing industries. b) Deriving the stop watch study in a machine shop, ten observation of a d

Bolter: ( k E 2  - kE 1) = 0, ( pE 2  - pE 1) = 0, w 1-2  = 0 Now,   q 1-2 = w 1-2  ( h 2  - h 1 ) + ( kE 2  - kE 1 ) + ( pE 2  - pE 1 ) q 1-2 =