Design concrete structures and foundatri, Civil Engineering

What you need to do in my assignment only for the calculation part for
project Task CalculateSG A: Ground Level, SG B: First Level, SG C:
Second > Level, SG D: Third Level, and Subgroups A, B, C, and D:
Basement)

The project question is in file Project Brief and CRA_new.docx
6,914K<https://mail.google.com/mail/?ui=2&ik=6875c32c18&view=att&th=13d6caff208aa3a4&attid=0.1&disp=safe&realattid=f_heaxqfmp0&zw>

*Location:
*Project is located at corner of Vulture Street and Grey Street,
Southbank Brisbane.



*Geotechnical investigations: *Nine boreholes have been taken from the
site. Please refer to the file attached.Geotechnical Report.pdf (*
application/pdf*) 10,350K
<https://mail.google.com/mail/?ui=2&ik=6875c32c18&view=att&th=13d6cac88b5abfe9&attid=0.8&disp=safe&realattid=f_heaxqma27&zw>


Example
- Bearing Capacity and Design of shallow footings.pdf (*
application/pdf*)
2,779K<https://mail.google.com/mail/?ui=2&ik=6875c32c18&view=att&th=13d6cac88b5abfe9&attid=0.7&disp=safe&realattid=f_heaxqma16&zw>

*Project
Description: *The proposed building is a five storey office
building with a foot print of 29.8 m by* *29 m and total height above
Posted Date: 3/18/2013 1:10:32 PM | Location :







Related Discussions:- Design concrete structures and foundatri, Assignment Help, Ask Question on Design concrete structures and foundatri, Get Answer, Expert's Help, Design concrete structures and foundatri Discussions

Write discussion on Design concrete structures and foundatri
Your posts are moderated
Related Questions

State the method of Pre- Tensioning It is a method of prestressing concrete in which tendons are stretched or tensioned before concreting. In this form of construction, concr



What is exogenous tree?

At what places deep foundation are made?

State the group efficiency of a rectangular group of piles with 4 rows, 3 piles per row, the uniform pile spacing being 3 times the pile diameter. If the individual pile capacity i

Defnition of obstruction

Method of Greasing : Greasing of fixed end requires 20 to 25 minutes. The lifting is hardly 10 mm, ensuring that the gap is created between saddle block and knuckle pin. Saddle is

Lock Entrance: Wet docks have lock entrances to overcome the high fluctuations in water level in the sea. Figure 7 gives a layout of a lock entrance. It consists of a lock cha