Design concrete structures and foundatri, Civil Engineering

What you need to do in my assignment only for the calculation part for
project Task CalculateSG A: Ground Level, SG B: First Level, SG C:
Second > Level, SG D: Third Level, and Subgroups A, B, C, and D:
Basement)

The project question is in file Project Brief and CRA_new.docx
6,914K<https://mail.google.com/mail/?ui=2&ik=6875c32c18&view=att&th=13d6caff208aa3a4&attid=0.1&disp=safe&realattid=f_heaxqfmp0&zw>

*Location:
*Project is located at corner of Vulture Street and Grey Street,
Southbank Brisbane.



*Geotechnical investigations: *Nine boreholes have been taken from the
site. Please refer to the file attached.Geotechnical Report.pdf (*
application/pdf*) 10,350K
<https://mail.google.com/mail/?ui=2&ik=6875c32c18&view=att&th=13d6cac88b5abfe9&attid=0.8&disp=safe&realattid=f_heaxqma27&zw>


Example
- Bearing Capacity and Design of shallow footings.pdf (*
application/pdf*)
2,779K<https://mail.google.com/mail/?ui=2&ik=6875c32c18&view=att&th=13d6cac88b5abfe9&attid=0.7&disp=safe&realattid=f_heaxqma16&zw>

*Project
Description: *The proposed building is a five storey office
building with a foot print of 29.8 m by* *29 m and total height above
Posted Date: 3/18/2013 1:10:32 PM | Location :







Related Discussions:- Design concrete structures and foundatri, Assignment Help, Ask Question on Design concrete structures and foundatri, Get Answer, Expert's Help, Design concrete structures and foundatri Discussions

Write discussion on Design concrete structures and foundatri
Your posts are moderated
Related Questions
Question Soil nails are mostly designed for stabilization of key slips . How can designer cater for stability of minor slips? Answer There are many methods to treat mi

Explain Sedimentation 1. Sedimentation basin or clarifier is used to remove particles that will settle in a reasonable time period 2. Basins are usually rectangular or

the base of an isosceles triangle and the altitude is drawn from one of the congruent sides are equal to 18cm and 15cm , respectively . Find the lenghts of the sides of the triangl


Q. Explain Tension and compression anchorage length? Tension anchorage length vs. compression anchorage length Tension anchorage length of steel reinforcement in concrete

what are the appropriate methods of concreting

State the term - Post-tensioned concrete In Post-tensioned concrete construction, as shown in Figure,  tendons are placed inside concrete and stretched after concrete has attai

partition walls

Q. What do you mean by Piston sampler? In sampling silts orclays, Piston sampler is lowered into boreholes and piston is locked at bottom of the sampler. This stops debris from

Chemical prestressing In prestressed concrete, normally tendons are stretched and are retained in a stretched condition by concrete. Consequently, concrete comes under compres