Design concrete structures and foundatri, Civil Engineering

What you need to do in my assignment only for the calculation part for
project Task CalculateSG A: Ground Level, SG B: First Level, SG C:
Second > Level, SG D: Third Level, and Subgroups A, B, C, and D:
Basement)

The project question is in file Project Brief and CRA_new.docx
6,914K<https://mail.google.com/mail/?ui=2&ik=6875c32c18&view=att&th=13d6caff208aa3a4&attid=0.1&disp=safe&realattid=f_heaxqfmp0&zw>

*Location:
*Project is located at corner of Vulture Street and Grey Street,
Southbank Brisbane.



*Geotechnical investigations: *Nine boreholes have been taken from the
site. Please refer to the file attached.Geotechnical Report.pdf (*
application/pdf*) 10,350K
<https://mail.google.com/mail/?ui=2&ik=6875c32c18&view=att&th=13d6cac88b5abfe9&attid=0.8&disp=safe&realattid=f_heaxqma27&zw>


Example
- Bearing Capacity and Design of shallow footings.pdf (*
application/pdf*)
2,779K<https://mail.google.com/mail/?ui=2&ik=6875c32c18&view=att&th=13d6cac88b5abfe9&attid=0.7&disp=safe&realattid=f_heaxqma16&zw>

*Project
Description: *The proposed building is a five storey office
building with a foot print of 29.8 m by* *29 m and total height above
Posted Date: 3/18/2013 1:10:32 PM | Location :







Related Discussions:- Design concrete structures and foundatri, Assignment Help, Ask Question on Design concrete structures and foundatri, Get Answer, Expert's Help, Design concrete structures and foundatri Discussions

Write discussion on Design concrete structures and foundatri
Your posts are moderated
Related Questions
dfwersgd


Categories of losses of prestress We may put various losses in either of two categories : Losses which take place during transfer of  prestress and those which take place after

Common defects - bituminous roads: Cracks can be filled with a bitumen emulsion. Wide cracks can be filled with premix sand asphalt. If an overlay is to be laid on a cracke

Define Equipments and tools for Inspection of Steel/Cast Iron Substructures? To ensure thorough inspection, the area must be cleared of all marine growth. Hand tools such as wi


The diameter of an electric cable, say X, is assumed to be continous random variable with pdf;f(x)=6x(1-x), 0 b}.

The soil in a borrow pit has a void ratio of 0.90. A fill-in-place volume of 20,000 m 3 is to be constructed with an in-place dry density of 18.84 kN/m 3 . If the owner of borr

Landing Systems: There are two basic types of landing, viz : (a) visual landing, when the weather conditions are favourable, and (b) instrumented landing, when the weat

what is meant by fly levelling and when it is carried out ?