Depict the project network using aon, Operation Management

Task time estimates for a production line setup project at Robert Klassens Ontario factory are as follows: Activity Time (in hours) Immediate Predecessors A 6.0 B 7.2 C 5.0 A D 6.0 B, C E 4.5 B, C F 7.7 D G 4.0 E, F a) Draw the project network using AON. b) Identify the critical path. c) What is the expected project length?

Posted Date: 2/14/2014 2:27:57 AM | Location : United States







Related Discussions:- Depict the project network using aon, Assignment Help, Ask Question on Depict the project network using aon, Get Answer, Expert's Help, Depict the project network using aon Discussions

Write discussion on Depict the project network using aon
Your posts are moderated
Related Questions
Question: Large retailers, in general, tend to move from a business model characterised by a fragmented network of many small-to-medium scale retail operations located in city

Goldratt - Theory of Constraints 1 identify the systems constraints  2 exploit the systems constraints  3 subordinate everything else to the above decision  4 elevate


Features of Production and Operation Management 1. Production management is the process of making decisions. 2. Decisions are made regarding transformation of inputs outputs. 3

air travel on Mountain Airlines for the past 18 weeks was: Week Passengers 1 404 2 410 3 420 4 415 5 412 6 419 7 424 8 433 9 438 10 440 11 446 12 451 13 455 14 460 15 466 16 474 17

A manufacturing firm is considering two locations for a plant to produce a new product. The two locations have fixed and variable costs as follows: Site Fixed Cost (Annual) Variabl


Process Charts Process chart is the diagrammatic representation of various tasks and activities in sequence of operation passing through the production process beginning with

1. (a) For the measurement data presented below, draw a frequency histogram using a class width of 0.1 mm; calculate the sample means and superimpose their frequency histogram; com