Question:

Spencerville Products is expanding its operations west of the Mississippi.  Its first step is to build a manufacturing facility in Denver to satisfy demand on the West Coast.  Spencerville has an option to build either a large facility that has an annual output of 500,000 units per year or a smaller facility with an output of 250,000 units per year.  It must build one of these two facilities - it does not have any other options.

The expected demand for the company's products is shown as either high or moderate in the table below:

Demand Level                        Annual Demand (units/year)                       Probability

High                                        450,000                                                    0.4

Moderate                                 150,000                                                    0.6

The small facility has a profit of $5.00 per unit.  The large facility has a profit of $4.00/unit.

a) What size facility should Spencerville Products build based on expected values and using a decision tree approach?  You must also provide the decision tree using the appropriate decision tree symbols.

b)  Suppose that the company is not certain about the 450,000 projection for the High Demand scenario.  It could be higher than this projection.  How sensitive is the selection in a) to the High Demand projection.  In other words, at what annual demand for the High Demand scenario would the company be indifferent between the two size facilities?

 


Related Discussions:- Decision tree approach

LPP, a paper mill produce two grades of paper viz., X and Y. because of raw...

a paper mill produce two grades of paper viz., X and Y. because of raw material restrictions, it cannot produce more than 400 tona of grade X and 300 tons of grade Yin a week. ther

Non parametric tests - hypothesis testing, NON PARAMETRIC TESTS All  ...

NON PARAMETRIC TESTS All  practical  data follow normal distribution under  such situations can estimate the  parameters such  as mean  variance etc ,,, and use the  standard

Models, Which model is described as a rule of thumb

Which model is described as a rule of thumb

Network problem, Consider the following network where the value on each arc...

Consider the following network where the value on each arc represents the capacity of that arc. Use the augmenting path algorithm to find the value of the maximum flow from node 1

Formulate this as a Linear Programming Problem., A paper mill produces two ...

A paper mill produces two grades of paper viz., X and Y. Because of raw material restrictions, it cannot produce more than 400 tons of grade X paper and 300 tons of grade Y paper i

Linear programming, . A paper mill produces two grades of paper viz., X and...

. A paper mill produces two grades of paper viz., X and Y. Because of raw material restrictions, it cannot produce more than 400 tons of grade X paper and 300 tons of grade Y paper

Chart the historical prices based on the monthly data, Choose a publicly tr...

Choose a publicly traded company (NYSE, AMX, or OTC) that interests you. If you don't know how to choose a company, think of IBM, DELL computer, Nike, Apple computer, GM, Ford, Nok

Making decision - hypothesis testing, Making Decision Lastly a deci...

Making Decision Lastly a decision  should  be arrived as to whether the null  hypothesis is  to be accepted  or rejected. In  this regard the value  of the test  statistic

Linear pograming, application area of linear programing problem

application area of linear programing problem

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd