Control function in production management, Mechanical Engineering

Control Function in Production Management:

Controlling is a sub system of the production system where a part of the output is monitored for feedback signals to give corrective action, if required. The management and control of inventory is a general problem to all kinds of organisations. Inventory control refers to the planning for optimum quantities of materials at all of the stages in the production cycle and evolving techniques which would make sure the availability of planned inventories.

Quality control assures that resulting product shall perform its intended function. Thus, this is concerned with the prevention of defects so that items can be made right at the first time. To attain this several activities are needed to perform. Inspection and control of raw materials ensure that they meet specification. Statistical quality control (SQC) attempts to evaluate machines, materials by observing capabilities and trends in variation so that continual analysis and production can be made to the wanted quality level.

Posted Date: 2/1/2013 7:32:36 AM | Location : United States







Related Discussions:- Control function in production management, Assignment Help, Ask Question on Control function in production management, Get Answer, Expert's Help, Control function in production management Discussions

Write discussion on Control function in production management
Your posts are moderated
Related Questions
Aggregate Production Planning: This unit provides the definition and physical significance of aggregate production planning. Further, this is illustrated that how the internal

Define the Boundary Representation of solids Boundary model or b-rep model is based on the topological notion that a physical object is bounded by a set of faces. These faces a

the velocity of a particle moving along x axis is defined by v=kx^3-4x^2+6x where v is in m/s,x in m and k is a constant .if k=2 compute the acceleration when x=2m #Minimum 100 wor

what are the practical applications and use of finding uniform distributed load, concentrated point load, inclined point load, roller supported beam.

Calculations for the force to move a block: T wo blocks A and B having weight 4KN and 2KN respectively are in equilibrium position as shown in the figure given below. Coeffi

what is a deficient frame?

Q. Formed heads of vessels? Formed heads are generally of 2:1 semi ellipsoidal form, but other heads may be used, such as hemispherical, torispherical, conical and toriconical.

Find out the mechanical advantage of the machines: A lifting machine may lift 800 N by the application of 100 N. Distance moved by the effort is 100 cm. At the same time load

Find the weight percent of austenite present in the steel: A 0.4% C hypoeutectoid plain carbon steel is slowly cooled from 1540 o C to (i) slightly above 723 o C and (ii) s

Types of Registration Provisional Registration Certificate ( PRC ) This is given for the pre-operative period and enables the units to obtain the term loans and worki