Codes and standards for steam generator, Mechanical Engineering

Codes and Standards for steam generator

All equipment purchased, and installation work done, shall be in accordance with the:

• Canadian Electrical Code

• Alberta Electrical Protection Act

• Purchaser Specifications

All equipment should be CSA approved, but in the event of special non-CSA approved equipment being required, it will be the supplier's or manufacturer's responsibility to obtain local EPB approval.

Posted Date: 7/10/2013 3:42:53 AM | Location : United States







Related Discussions:- Codes and standards for steam generator, Assignment Help, Ask Question on Codes and standards for steam generator, Get Answer, Expert's Help, Codes and standards for steam generator Discussions

Write discussion on Codes and standards for steam generator
Your posts are moderated
Related Questions
Stitch welding Here, a series of overlapping spot welds are made with the spot welding machine using the conventional electrode tip. Both water tight and gas tight joints can b

Grease Gun: A grease gun is shown in Figure. This is used to supply semi-solid lubricant (grease) for chassis lubrication. Figure : Grease Gun

Need of a spectrophotometer: The specific instructions will differ with other models, but the principles remain. 1. The instrument must have been warm for at least 15 min.

1.  What is a soil in an engineering context? Define. 2.  (a)  What is a clay? (b) What are the major properties and characteristics of clay? Discuss. (c)  Define the term

Q. Show Conceptual Layout of plant ? During the Evaluate phase of a project, the early concept design considers broad information of the expected installation, and its basic cr


Law of coulomb friction: Coulomb in the year 1781 presented certain conclusions which are called as Coulomb's law of friction. These observations are based on experiments on b

Extension of auger in the main auger arrangement The original size of screw conveyer without auger extension is 2.5 m., which is same as size of chassis. Which to be attach wit

#question.needs help to do my assignment.

Q. Postweld heat treatment? When the equipment data sheet specifies post-weld heat treatment either for service conditions or code requirements, welding, hammering (peening), o