Define Circular Channels Flowing Partially Full Two sets of curved lines on the Circular Channel Ratios figure (discharge Q/Q full and velocity v/v full ).  1.  "n" variabl

Q. Explain Tension and compression anchorage length? Tension anchorage length vs. compression anchorage length Tension anchorage length of steel reinforcement in concrete

Given for the section shown in Figure, M * = 250 kNm, f sy = 500 MPa and f c ′ = 25 MPa. Compute A st and (if necessary) A sc . You may assume that eac

Explain the Routine inspections - inspection of bridge? These determine the physical and functional condition of the structure, identifying changes from the inventory, baseline

Q.for ISMB200 having 6.70 m span simply supported so find out load carrying capacity.

Instruments used in chain survey

Effect of concrete placing temperature on early thermal movement Rate of hydration of cement paste is related to placing temperature of concrete. Rate of heat production is giv

Design of Flexible Pavements: The design of flexible pavements is done by the CBR method. The CBR test, described further, gives an indication of the supporting power of the

Q. Test on complete bearings? Two bearings should be selected at random from the 'lot'. Various tests should be conducted on these 'test bearings'. These bearings should be exc

Q. What do you mean by Distressing? Distressing is the operation under taken with or with out rail tensors to secure stress free condition in the LWR at a desired rail temperat