Calculate the invert elevation of the sewer pipe, Civil Engineering

Assignment Help:

1. The center line elevation of the proposed roadway at station is 345+25.50 is 327.36-ft.   The existing ground top of cut elevation (ft) is most nearly:

2. A design engineer commissioned a test pit to determine the top of pipe elevation for a sewer extension project.  The existing sewer pipe is an 8-ft o.d. reinforced concrete pipe with wall thickness 10-in.  A back sight to a local benchmark with an established elevation of 45.66-ft is obtained with a level and a rod reading of 4.91-ft.

 A foresight is taken to a rod resting on the top of pipe with a reading of 12.43-ft.   

Calculate The invert elevation (ft) of the sewer pipe.


Related Discussions:- Calculate the invert elevation of the sewer pipe

Cocrete, preparation and uses of concrete

preparation and uses of concrete

Explain the strength design (lrfd), Explain the Strength Design (LRFD)   ...

Explain the Strength Design (LRFD)   1. γ Factors are applied to loads and φ factors applied to resistance. 2. Unfactored service loads receive a load factor γ > 1.0

Stiff or soft fenders be designed for berthing in piers, Question Is it...

Question Is it necessary that stiff or soft fenders be designed for berthing in piers? Answer Elasticity of fenders is related to ability to release stored energy duri

What is the meaning of wrapped splices, What is the meaning of Wrapped spli...

What is the meaning of Wrapped splices In the Wrapped splices, tendon wires are wrapped with small diameter high-tension wires along their lengths with the help of  wire windin

Quality control of concrete roads, Quality Control of Concrete Roads: ...

Quality Control of Concrete Roads: Concrete roads require a very high degree of quality control. The following aspects need to be checked regularly: (a) Strength, shape an

Determine the loss in post-tensioned members, Determine the Loss in post-te...

Determine the Loss in post-tensioned members This loss occurs only in post-tensioned members. There always exists a certain amount of friction in the jacking and anchoring syst

Binder, Binder: Normally 60/70 penetration grade, and provides cohesio...

Binder: Normally 60/70 penetration grade, and provides cohesion to the mixture and increases its stability. The mix design is done by the Marshall test, in which a specimen

Design concrete structures and foundatri, What you need to do in my assignm...

What you need to do in my assignment only for the calculation part for project Task CalculateSG A: Ground Level, SG B: First Level, SG C: Second > Level, SG D: Third Level, and Su

Water absorption test for precast concrete pipes, Purpose of carrying out w...

Purpose of carrying out water absorption test for precast concrete pipes Cement will mix with more water than is essential to ultimately combine during hydration of cement pas

Surveying, What is the shrinkage factor

What is the shrinkage factor

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd