Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
1. The center line elevation of the proposed roadway at station is 345+25.50 is 327.36-ft. The existing ground top of cut elevation (ft) is most nearly:
2. A design engineer commissioned a test pit to determine the top of pipe elevation for a sewer extension project. The existing sewer pipe is an 8-ft o.d. reinforced concrete pipe with wall thickness 10-in. A back sight to a local benchmark with an established elevation of 45.66-ft is obtained with a level and a rod reading of 4.91-ft.
A foresight is taken to a rod resting on the top of pipe with a reading of 12.43-ft.
Calculate The invert elevation (ft) of the sewer pipe.
classification of arches based on their shape are?
What is the actual mix propotion for M35/ C35 design mix concrete
Level 2 Acceptance Testing : This will also include the same tests as in Level 1 A. General inspection B. Test on specially moulded test piece C. Test on complete bearings
A city is trying to decide which of two traffic devices to install. Device A costs $1000 and has useful life of five years. Device A can be expected to result in $300 savings annu
definition,old&new modern&difference
what is preventive maintenance and state its advantages
difference between compass suveying and chain surveying
triangle of force
h = u + pv is a combination of properties and hence must also be a property. h is the SPECIFIC ENTHALPY in kJ/kg H = U + pV is the ENTHALPY in kJ
concrete strength
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd