An electrical contractor is preparing to place the duct bank concrete encasement for the high voltage feeders between manhole # 11 and # 12, total distance is 323-ft. The duct bank is 2-ft x 3-ft and holds nine 4.5-in Schedule 80 PVC conduits. The amount of concrete to be ordered is most nearly:
Solution:
Nominal 4-in Schedule 80 PVC pipe is 4.5-in O.D.
Total Volume = 2' x 3' x 323' = 1938-ft3 / 27-ft3/CY = 71.77-yd3
Total Deduct = 9 x (π ((4.5"/12")/ft)2)/4 x 323' = 321-ft3 / 27-ft3/CY = 11.89-yd3
Total Concrete = 71.77-yd3 - 11.89-yd3 = 59.88-yds3
What are plastics ?give their importance
First Can I use this device to test concrete specimen? Second it is very important for me that wouldn’t have tensile strength when I want to fix specimens. Because the specimens su
section of railway tracks in india ,all dimensions in meters
Carbonate Hardness (CH) - Water Softening Ca +2 , Mg +2 combining with alkalinity (OH - , CO 3 -2 , HCO 3 - ). If alkalinity is present in water the CH wil
How is corrosion perverted...?
ADVANTAGE AND DISADVANTAGE OF TIMBER PILE
explain operations of direct and indirect leveling?
floors
A soil has a plastic limit of 25% and a plasticity index of 30. If the natural water content of the soil is 34%, what is the liquidity index and what is the consistency index? H
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd