Calculate the amount of concrete - construction management, Civil Engineering

Assignment Help:

An electrical contractor is preparing to place the duct bank concrete encasement for the high voltage feeders between manhole # 11 and # 12, total distance is 323-ft. The duct bank is 2-ft x 3-ft and holds nine 4.5-in Schedule 80 PVC conduits. The amount of concrete to be ordered is most nearly: 

547_Calculate the Amount of Concrete.png

Solution:

Nominal 4-in Schedule 80 PVC pipe is 4.5-in O.D. 

Total Volume = 2' x 3' x 323' = 1938-ft3 / 27-ft3/CY = 71.77-yd3

 Total Deduct = 9 x (π ((4.5"/12")/ft)2)/4 x 323' = 321-ft3 / 27-ft3/CY = 11.89-yd3

Total Concrete = 71.77-yd3 - 11.89-yd3 = 59.88-yds3

 


Related Discussions:- Calculate the amount of concrete - construction management

Leveling, how to find the correction on leveling calculation

how to find the correction on leveling calculation

Major functions of features observed in a typical manhole, Question Wha...

Question What are the major functions of following features observed in a typical manhole ? Answer (i) Groove near benching, (ii) R.S.J. (iii) double seal manhole cove

Keywords of airport management, Keywords of Airport management: Air T...

Keywords of Airport management: Air Traffic Control: A system by which air routes, flight rules for flying aircraft and navigational facilities are provided in an airport.

Rail tensors, A hydro stressor consists essentially of a hydraulic pump whi...

A hydro stressor consists essentially of a hydraulic pump which transmits its force through connecting vans to clamps which grips the rail. In case of mechanical tensor the force i

Chemistry, What are plastics ?give their importance

What are plastics ?give their importance

Mixture of phases, Phases are usually identifiable because of adifference i...

Phases are usually identifiable because of adifference in density which causes gravitational separation. e.g. Ice floats on water, steam rises.

Describe principles of river protection works, Q. Describe Principles of ri...

Q. Describe Principles of river protection works? Determination of design discharge for a bridge is sometimes required to be based on flood marks left during unprecedented abno

.Chemestry, How desalination of water can be acheived by reverse osmosis an...

How desalination of water can be acheived by reverse osmosis and electrodialysis process?

Rubber dams – air-filled vs water-filled, Most of the existing rubber dams ...

Most of the existing rubber dams are of air-filled types. Water-filled rubber dams aren't preferred for the below reasons: (i)  By giving same sheet length and dam height, tensi

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd