An electrical contractor is preparing to place the duct bank concrete encasement for the high voltage feeders between manhole # 11 and # 12, total distance is 323-ft. The duct bank is 2-ft x 3-ft and holds nine 4.5-in Schedule 80 PVC conduits. The amount of concrete to be ordered is most nearly:
Solution:
Nominal 4-in Schedule 80 PVC pipe is 4.5-in O.D.
Total Volume = 2' x 3' x 323' = 1938-ft3 / 27-ft3/CY = 71.77-yd3
Total Deduct = 9 x (π ((4.5"/12")/ft)2)/4 x 323' = 321-ft3 / 27-ft3/CY = 11.89-yd3
Total Concrete = 71.77-yd3 - 11.89-yd3 = 59.88-yds3
Define the term - permanent load Where the permanent load is less than or equal to 25% of the design imposed load, deflections may be calculated using any elastic method. When
Classification Based on Modulus of Elasticity: Young's modulus is resolute by conducting bending test. On this basis timber is classified as following: Group A: E = 12.5 kN
Q. Show the Stresses during pile driving? Stresses during pile driving In pile driving operation, proper selection of piling hammers is necessary to prevent the damage of
we are given a project on field.i''d like to know about how to start n proceed vd fly levelling in the field
Draw the shape of the Pressure line. Solution The locations of resultant force at sections A-A, B-B and C-C have already been determined. Joining these locations, we can dr
Question In case if there is a delay of bituminous laying on top of sub-base, have to tack coat be applied on the top surface of sub-base? Answer When there is a d
Define Sample Collection - Clean Water Act? The collection of the sample is able to have significant effects on the complete analytical process. Additionally, to make sure some
Q. How to design banks? When approach banks are of medium height upto 3 m, the material may be homogeneous. For bigger heights zoned section with impervious core and pervious o
Compass Surveying: You have studied about the compass and its use for bearings of measuring survey lines. The angular measurements are carried out with prismatic compass that
An earthwork contractor encountered a location within the borrow area where the geological conditions changed. Instead of encountering 100 cubic yards of wet clay, the contractor
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!