Breast walls, Civil Engineering

Breast Walls

Needed to buttress uphill slopes.

79_Breast Walls.png

Figure : Breast

Check Walls

Small retaining structures provided in series to arrest landslides.

Gabion Walls

Provided for retaining fill portion, and constructed with dry stones encased in wires mesh or geogrid cages.

Parapet Walls

Needed for protecting vehicles from falling into the valley.

Posted Date: 1/22/2013 6:10:29 AM | Location : United States







Related Discussions:- Breast walls, Assignment Help, Ask Question on Breast walls, Get Answer, Expert's Help, Breast walls Discussions

Write discussion on Breast walls
Your posts are moderated
Related Questions
calculate height of instrument?

Shrinkage of concrete in prestressed members The shrinkage of concrete in prestressed members results in a shortening of ensioned wires and hence contributes to the loss of st

Q. Optimum binder content in bituminous pavement? Amount of binder to be added to a bituminous mixture can't be too excessive or too little. Principle of designing the optimum

I have building 50 m * 53 m 3 floors without expansion joint in basement what are opinion please ? thanks

define traverse.purpose of traverse, procedures of traverse, taking linner measurment, types of traverse, convert the following quardnatal bearing to wcb. 1.OA= N15 deg10mins ''E,

State the effect of friction for a straight tendon The length effect represents the effect of friction for a straight tendon due to slight imperfections of the duct. In practic

Variations of tendon stresses in pre or post-tensioned concrete Variations of tendon stresses in pre or post-tensioned concrete members, along the length of tendons, may be of

Define Problems in turbid water - underwater inspection of bridge? There are three main problems, which limit the viewing performance of an underwater camera. These are: -

What is the rate of application of Prime coat over WBM

Project specifications require a relative compaction of 95% (modified Proctor).  Construction of a highway embankment requires 10,000-yd 3 of fill.  The borrow soil has an in-situ