Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
The EV is to be used for city transportation, it should carry a maximum total load of 325 kg (passengers and cargo). The battery back used will be 365 kg, 44 kilowatt hours lithium Iron phosphate type.
The maximum speed of the EV is 60 km/hour and it should be able to maintain a speed of 50 km/hour on a 10% slope. The vehicle should be able to attain its maximum speed in 10 seconds or less from stand still.
In order to reduce maintenance cost the vehicle should be designed with a single speed gear ratio or direct drive motor(s).
You can pick an existing chassis or design your own.
Your analysis and design calculations should include:
Calculate the radius of plates: A laminated steel spring, simply supported at the ends & centrally loaded, along a span of 0.8 m; is needed to carry a proof load of 8 kN; and
a steel bar is 900 mm long
how to draw riveted joints
Explain about the eccentrically loaded footings. ECCENTRICALLY LOADED FOOTINGS When footings have overturning moments and axial loads, the base pressure under the footing wi
The total resistance of the system between the electrodes consists of (i) The resistance of the work piece R 1 (ii) The contact resistance between the electrodes and the wo
hello. what is the shape of the fractur of brittle material after applied th tensil test.
(a) What do you understand by couple moment. Is it a free vector ? (b) A force F = 10i + 6j - 6k N performs at a position (10, 3, 4) m relative to a coordinates system. Determin
EFFECT OF PROCESS PARAMETERS High voltage gives high velocities in the electron beams. The mutual repulsion effects in the constituent electrons will be less marked at high vel
EQUIPMENT FOR RESISTANCE WELDING-Protection A circuit breaker can be provided (this equipment can be rated for interrupted capacity) which will cater to a number of resistance
Short-Term Scheduling And Control The major objective at this stage is to make sure the efficient and smooth operation of the system in the event of unforeseen disturbances. Th
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd