Advantages associated with this kind of material, Civil Engineering

Assignment Help:

Question

In pumping stations one of choices for the material of water tanks is fibre-reinforced plastic. What are main advantages associated with this kind of material?


Answer

There are two key compensation for FRP water tanks-

(i) It possesses high strength to weight ratio and this leads to effortlessness of site handling.

(ii) It is extremely resistant to corrosion and thus it is additional tough than steel water tank.


Related Discussions:- Advantages associated with this kind of material

Hydraulics, A rectangular channel, 20ft wide is shown. The channel consists...

A rectangular channel, 20ft wide is shown. The channel consists of three reaches of different slopes. The channel has a roughness coefficient of n=0.015 and carries a discharge of

Design approach for the spacing of min-piles, Design approach for the spaci...

Design approach for the spacing of min-piles For close spacing of min-piles, it would provide substantial cost savings with reduction of pile cap size. Though close spacing of

State active earth pressure behind a vertical wall, With the aid of Mohr's ...

With the aid of Mohr's circle diagram describe what means by active and passive Rankine states is in a cohesionless soil with a horizontal surface. As obtain an expression for the

Surveying., with a neat well labelled, explain reciprocal ranging in survey...

with a neat well labelled, explain reciprocal ranging in surveying.

Write definition of afflux and skew bridge, Write definition of the followi...

Write definition of the following - (i) Afflux. ( ii ) Free Board. ( iii ) Clearance. ( iv ) Via duct. ( v ) Skew Bridge ( vi ) Cause Way. ( vii ) Clear Span. ( v

How to calculate the diameter of the footing, A circular footing rests on a...

A circular footing rests on a pure clay with qu = 270 kN/m 2 , at a depth of 1.8 m. Verify the diameter of the footing if it has to transmit a load of 720 kN. Suppose the bulk u

Indicate quality of rock foundation, Question During piling works, norm...

Question During piling works, normally founding levels of bored piles are definite by using total core recovery or rock quality designation (RQD). Are there any problems by

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd