Plot turbulence intensity profiles for velocity components

Assignment Help Civil Engineering
Reference no: EM13860409

Wind Effects on Building Components and Cladding

1. In the spreadsheet "lecture 2 velocity fluctuations.xlsx" there are three sheets labelled as "flat", "open" and "suburban". These sheets contain measured velocity data in one of the boundary layer wind tunnels at Western. The streamwise velocity component is labelled U, V is the lateral component, and W is the vertical component. Find:

(a) u* and Zo values for each profile using the log law, and

(b) the power law coefficients, α, for the mean profiles.

(c) Plot the turbulence intensity profiles for the 3 velocity components. Compare these with the profiles determined using the log law on slide 24 from lecture 2, using the log law coefficients determined in part (a). Discuss how you might change Zo based on these models if you were more concerned with the turbulence levels than the mean speeds.

(d) Assuming a peak factor of 3.0, plot the peak velocity profiles using the experimental data. Determine the power law coefficients, α, associated with these peak speeds. Compare these with the values in ASCE 7 (slide 30 in Lecture 2) and discuss what types of terrain these wind tunnel profiles may represent.

(e) If it can be assumed that these profiles represent model-scale analogues of the atmospheric boundary layer, discuss what the length scale may be considering the mean velocity, turbulence intensity and peak wind speed profiles. Note that the length scale, λL, is defined as the ratio of the height in the wind tunnel (model-scale) to the equivalent height in the atmosphere, i.e., λL = Zms/Zfs. Make sure to discuss your assumptions.

(f) Find the exposure factors for the three terrains at z = 0.1016 m, 0.2032 m, and 0.3048 m if the "open" profile is assumed to be the basic terrain, converting these to full-­-scale heights using your model scale determined in (e). Use the z = 0.1016 m height (converted to full-­-scale) as the relevant reference height for the basic wind speed. Calculate the ASCE 7 exposure factors, Kh (or Kz), and compare these values to the wind tunnel data. Discuss the assumptions you have made.

2. For the buildings shown in the figure below (dimensions given in m), (a) determine the size of roof and wall zones using ASCE 7. Sketch these zones. (b) For each house and zone, determine the GCp values for a sheet of plywood (1.2m x 2.4m) - if the plywood is larger than the zone size, discuss your choice for determining the pressure coefficient. Please put these in tabular form. (c) If the houses are located in suburban terrain and the basic wind speed, V, is 95 mph, determine the wind load for these sheathing panels assuming that the internal pressure coefficient is 0 and that the internal pressure is for a partially-­-enclosed building (i.e., one with a large opening in one wall).

1011_Buildings.jpg

3. In the spreadsheet "wind speed data.xlsx", there is a time series of wind tunnel velocity data obtained in a wind tunnel. Determine:

(a) the mean velocity, and

(b) the turbulence intensity.

(c) Create a "Durst curve".

(d) Compare the results from (c) with the actual Durst curve assuming the mean speed is like an hourly speed. To make these match (to the extent that they can), the model-­-scale time has to be converted to full-­-scale time using the relation for time scale as λt = tms/tfs, where t is time. Determine the best time-­-scale, discussing your assumptions and why differences between the curves may exist, noting that the data may not be from an "open" terrain.

Reference no: EM13860409

Questions Cloud

What are the characteristics of a good taxation system? : What are the characteristics of a good taxation system?
Describe the classical theory of international trade : Describe and explain the classical theory of international trade, could you guys help me out?
Find the probability that the customer : If you choose a customer at random, then find the probability that the customer-was new and paid in cash.
Environmental procedures adhered to within the industry : Critical evaluation and comments by the student on the usefulness of the training and its relevance to university education, Safety and environmental procedures adhered to within the industry.
Plot turbulence intensity profiles for velocity components : Plot the turbulence intensity profiles for the velocity components and compare the results from (c) with the actual Durst curve assuming the mean speed is like an hourly speed.
Find the natural frequencies of the system : You decide to use Holzer's method to find the natural frequencies of the system and determine the mode shapes, and to construct a plot of total torque vs. a, over the frequency range where the mode frequencies exist.
Find the internal rate of return : Find the internal rate of return
How the time value of money might take on importance : Give three examples of how the time value of money might take on importance in business decisions
What''s robert lucas'' view on business cycle : 1.What's Robert Lucas' view on business cycle? Do you agree with his view? Why? 2. Define economic variables that are procyclical, countercyclical or acyclical. Are real wages, GDP, employment procyclical, countercyclical or acyclical? Why?

Reviews

Write a Review

Civil Engineering Questions & Answers

  What is chemical name of first hazardous air pollutant

What is the chemical name of the first hazardous air pollutant under Title III regarding the Clean Air Act

  Determine the friction drag on one side of the plate

Water flows past a triangular flat plate oriented parallel to the free stream as shown. Integrate the wall shear stress over the plate to determine the friction drag on one side of the plate. Assume laminar boundary layer flow.

  Determine the final velocity of the carrier

A 30 g bullet is fired with a horizontal velocity of 450 m/s through 3-kg block B and becomes embedded in carrier C which has a mass of 30 kg. After the impact, block B slides 0.3m on C before coming to rest relative to the carrier.

  How much larger should street name be in order to be legible

street nam sizes on the signs at a certain location can be discerned by a person with 20/40 vision from a distance of 300 ft. how much larger should the street names be in order to be legible to a person with 20/50 vision from a distnace of 450 ..

  What power is needed from the pump on the water

The total length of the hose is 65 m with 200-mm diameter. The exit diameter of the nozzle is 100 mm. Take e/D for the hose as 0.0001. What power is needed from the pump on the water

  What is the rectangles product of inertia

If = 300 N , determine the required minimum compression in the spring so that the wedge will not move to the right. Neglect the weight of A and B. The coefficient of static friction for all contacting surfaces is .2 Neglect friction at the rollers.

  A water pump can generate a pressure diference

A water pump can generate a pressure diference ΔP (psi) given by ΔP=145-0.1Q2, Q is the flow rate in ft3/s. It suplies a pipe of diameter 20", roughness of .5 inches and length of 2500 ft.

  Determine what will be the percent conversion

A plug-flow reactor has a conversion of A of 90%, and the reaction is first order. If a dispersed plug-flow reactor has the same volume and has a dispersion number, D/vL of 1.0

  Estimate the volume flow rate per meter of width

Water flowing in a wide channel of depth 35 cm undergoes hydraulic jump that resulted in energy dissipation of 72%. Estimate (a) the downstream depth, (b) the volume flow rate per meter of width.

  Determine the momentum change of a person with a mass

Suppose that a person who boards the elevator on the ground floor gets off on the fifth floor. Assuming that the elevator has achieved operating speed by the time it reaches the second floor and that it is still moving at its operating speed as it..

  What is the original estimated duration of the project

The initial schedule called for 500 feet of pipeline to be installed each week, with the total construction cost projected to be $25 million. After 8 weeks, 4750' of pipeline has been installed at a cost of $11.25 million.

  Explain break even stripping ratio

Break Even Stripping Ratio (BESR), Given an underground total mining cost of $8.85 per tonne, surface mining costs of $2.95 per tonne of ore, and surface mining stripping costs of $1.75 per tonne of waste

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd