Determine the total work produced during this adiabatic

Assignment Help Civil Engineering
Reference no: EM13543443

An adiabatic piston-cylinder device equipped with a spring maintains the pressure inside at at 300kPa when the volume is 0, and 3000kPa when the volume is 5 m3. The device is connected to a steam line maintained at 1500kPa and 200 C, and the initial volume is 0. Determine the final temperature (and quality if appropriate) when valve is opened and steam in the line is allowed to enter the cylinder until the pressure inside matches that in the line. Also determine the total work produced during this adiabatic filling process.

Reference no: EM13543443

Questions Cloud

Calculate the position of the loop as the end of the whip : Assuming the mass of the whip is uniformly distributed along its length, calculate the velocity of the end of the whip as a function of the position of the loop (x), and calculate the position of the loop as the end of the whip breaks the speed of so..
Determine flow rate in a series pipe system given that rough : A sample of moist soil has a volume of 40.5 cc mass weight of 59.2 gms. After drying it has a mass weight of 48.3 grams. The specific gravity of the solids are 2.68. Compute the degree of saturation, water content and void ratio.
Revolve the pavement about its inside edge : Calculate the super-elevation required for a horizontal curve on a two-lane, two- way highway with 60 mph design speed, and a 1200 ft. radius curve. What is the required length of the spiral curve?
What should be the surface area of each tank : Do the problem again but for an alum or iron floc with an overflow rate 20 m3/day.m2?
Determine the total work produced during this adiabatic : An adiabatic piston-cylinder device equipped with a spring maintains the pressure inside at at 300kPa when the volume is 0, and 3000kPa when the volume is 5 m3. The device is connected to a steam line maintained at 1500kPa and 200 C
Determine the initial discharge velocity from the tank : Where z is the water height above the center of the valve. Determine (a) the initial discharge velocity from the tank and (b) the time required to empty the tank. The tank is considered to be empty when the water level drops to the center of the valv..
Find the center of gravity of the given composite body : The tube supports the four parallel forces. Determine the magnitude of the forces and acting at C and D so that the equivalent resultant force of the four forces acts at point O.
Will such a procedure produce a greater flowrate : A 12in diameter water main in your city has become very rough due to rust and corrosion, it has been suggested that the flowrate through the this pipe can be increased by inserting a smooth plastic liner into the pipe.
How much time should each employee spend at each in order : To avoid boredom, employees are assigned all three tasks at different times during the shift. Each employee has to work at least half an hour at each station during a five hour shift. How much time should each employee spend at each in order to maxim..

Reviews

Write a Review

Civil Engineering Questions & Answers

  A rectangular beam made using concrete with fc 6000 psi

a rectangular beam made using concrete with fc 6000 psi and steel with fy60000 psi has a width b 20 in. the concrete

  Compute the difference in design curve lenghts for designs

The curve is to be redesigned for a 70 mph design speed in the year of 2025. Vehicle braking technology has advanced so that the recommended design deceleration rate is 25% greater that the 2011 value used to develop

  What is the average velocity

hydrogen is flowing in a 50 mm diameter pipe at a mass rate of 0.01 kg/s. at section 1 the pressure is 280 kPa abs and t= 25 . what is the average velocity?

  How we calculate the ultimate moment

How we calculate the ultimate moment ( Mu) for the column design in case of a two storied school building framed structure. Only given data is loads coming from various slabs , beams around the column.

  Find the amount of work in foot-pounds required to empty

The vertical cross-section of the trough parallel to an end is shaped like the graph of y=x6 from x=-1 to x=1 . The trough is full of water. Find the amount of work in foot-pounds required to empty the trough by pumping the water over the top.

  Determine water level rise in an unconfined aquifer produced

Determine the water level rise in an unconfined aquifer produced by a seasonal precipitation of four inches. The aquifers porosity is 20 percent and its specific retention is 9 percent.

  Check whether the pressure is adequate for service

If the elevation of the pipeline at the treatment plant is 125 m, estimate the pressure in the pipeline 1 km downstream where the elevation if 110 m. Hint: Use the Colebrook equation to estimate f, and the energy equation to estimate P2 .

  Is this a good settling sludge or this operator in trouble

A waster water treatment operator runs a sludge volumeindex test in a liter cylinder and finds at the end of 30 minutessettling, the solids occupy 200mL. He knows the suspendedsolids concentration in his aeration tank from which he got thesample is 4..

  Find time and distance downstream at critical point occurs

Just below the point where a continuous discharge of pollution mixes with the river, the BOD is 10.9 mg/L and the DO is 7.6 mg/L. The river and waste mixture has a temperature of 20oC, a deoxygentation constant of 0.2/day

  Determine what is the euac for a 10-year period

Zwango Plus Manufacturing experts that fixed costs of keeping its Zephyr Hills Plant operating will be $1.4M this year. If the fixed costs increase by $100,000 each year, what is the EUAC for a 10-year period Assume the interest rate is 12%.

  What viscosity must this liquid have for both reynolds

A ship 200 m long moves through fresh seawater (ρ = 1,025.6kg/m3) at 32 km/h. A model of this ship (scale 1:75) isto be tested in a towing basin containing a liquid of specificgravity 0.85.

  Determine deviation at the top of trajectory caused by wind

A fireworks shell is launched vertically from point A with speed sufficient to reach a maximum altitude of 500ft. A steady horizontal wind causes a constant horizontal acceleration of 0.5ft/sec^2, but does not affect the vertical motion.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd