Determine the average time in system

Assignment Help Other Engineering
Reference no: EM13844028

Question 1: Travelers arrive at the main entrance door of an airline terminal according to an exponential interarrival-time distribution with mean 1.6 minutes, with the first arrival at time 0. The travel time from the entrance to the check-in is distributed uniformly between 2 and 3 minutes. At the check-in counter, travelers wait in a single line until one of five agents is available to serve them. The check-in time (in minutes) follows a Weibull distribution with parameters β = 7.78 and α = 3.91. Upon completion of their check-in, they are free to travel to their gates. Create a simulation model, with animation (including the travel time from entrance to check-in), of this system. Run the simulation for a single replication of 16 hours to determine the average time in system, number of passengers completing check-in, and the time-average length of the check-in queue. Put a text box in your model with the numerical results requested.

Question 2: Modify the question 1 check-in problem by adding agent breaks. The 16 hours are divided into two 8-hour shifts. Agent breaks are staggered (that is, one agent goes on break, and immediately upon return, the next agent goes on break, until all agents have had their breaks), starting at 90 minutes into each shift. Each agent is given one 15-minute break. Agent lunch breaks (30 minutes) are also staggered, starting 3.5 hours into each shift. The agents are rude and, if they're busy when break time comes around, they just leave anyway and make the passenger wait until break time is over before finishing up that passenger (since all agents are identical, it's not necessary for the same agent to finish up that passenger). Compare the results of this model to those of the model without agent breaks. Put a text box in your model with the numerical results requested, andew words repeat those same results from Question 1 in this text box for ready comparison; write a few your text box to address the question about comparison with Question 1.

Question 3:  During the verification process of the airline check-in system from Question 2, it was discovered that there were really two types of passengers. The first passenger type arrives according to an exponential interarrival distribution with mean 2.41 minutes and has a service time (in minutes) following a gamma distribution with parameters β = 0.42 and α = 14.4. The second type of passenger arrives according to an exponential distribution with mean 4.4 minutes and has a service time (in minutes) following 3 plus an Erlang distribution with parameters ExpMean = 0.54 and k = 15 (that is, the Expression for the service time is 3 + ERLA(0.54, 15)).

A passenger of each type arrives at time 0. Modify the model from Question 2 to include this new information.

Compare the results. Put a text box in your model with the numerical results requested, and repeat those same results from question 2 in this text box for ready comparison; write a few words in your text box to address the question about comparison with question 2.

Reference no: EM13844028

Questions Cloud

What is the multifactor productivity ratio : It takes the Kwinzee shipyard six months with 500 workers to build a small tanker. Material costs are $32 million and overhead costs are $2 million. Workers cost $40 per hour including benefits and work 40 hours per week. The ship sells for $75 milli..
According to an exponential distribution : There is only one copying machine in the student lounge of the business school. Students arrive at the rate of? = 40 per hour (according to a Poisson distribution). Copying takes an average, of 40 seconds, or? = 90 per hour (according to an exponenti..
Which theory best job of explaining adult criminality : Which social process theory does the best job of explaining adult criminality? Which social process theory does the best job of explaining juvenile delinquency
What is the equilibrium concentration of h2 : what is the equilibrium concentration of H2
Determine the average time in system : Determine the average time in system, number of passengers completing check-in, and the time-average length of the check-in queue. Put a text box in your model with the numerical results requested.
Effectiveness of staffing process for entry-level jobs : In developing a report on the effectiveness of a staffing process for entry-level jobs, what factors would you address and why?
Construct house of quality matrix for wristwatch : Construct a house of quality matrix for a wristwatch. Be sure to indicate specific customer wants that you think the general public desires. Then complete the matrix to show how an operation's manager might identify specific attributes that can be me..
Compensation-benefits for flexible and contingent employees : Discuss and explain the challenges when determining compensation and benefits for flexible and/or contingent employees. Include in your discussion the advantages and disadvantages of telecommuting. In your discussion include the concept of total comp..
Provide a rationale or evidence to support a position : The student articulates a position on the issue but fails to provide a rationale or evidence to support that position. The student fails to explain or support their position on the issue.

Reviews

Write a Review

Other Engineering Questions & Answers

  Assume that you are managing a design project which will

imagine you are managing a design project that will create an interface for automobile mechanics. the interface would

  Create a flash movie that uses motion animation

Create a Flash movie that uses motion animation to change a figure from a large size to a small size and back as it moves from the top to the bottom of the right side of the stage

  Installation of fm radio

Installation of FM radio, At this time working at (xxxplace)  I did budget requisition for equipment needed for radio installation.

  Define stripping ratio and give three examples

Define stripping ratio and give three examples of the units it may be expressed in.

  Calculate heat capacity for both heat and cold flow

Calculate Heat capacity for both heat and cold flow - Since cold flow has higher heat capacity rate means hot flow has lower heat capacity rate

  Solve geotechnical and hydraulic engineering problems

Demonstrate knowledge and understanding of the key engineering principles that underpin current geotechnical and environmental engineering together with potential future developments

  Using replacement analysis decide when the company should

a large electronics manufacturing company is considering starting a new production line to replace an existing old

  Environmental engineeringquestion 1 sulfur dioxide so2 is a

environmental engineeringquestion 1 sulfur dioxide so2 is a gas that is released from the burning of fossil fuels in

  Identify at least four of the key decisions made during the

1. identify at least four of the key decisions made during the pre-initiating and initiating processes. do you think

  Write a program to find the sum of the elements of an array

Write a program to find the sum of the elements of an array called list1. The size of list1 is four bytes. The values of list1 are $FF, $1, $FE, and $02. To check your work, the sum should become $0200

  The importance of impedance, rise-time and bandwidth

Discuss the connection between rise-time and bandwidth in amplifier circuits.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd