Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
A crane is used to lift a concrete pipe weighing 10kN into place. For precision positioning, the worker at C can apply up a 800N force to cable AC. Determine the largest distance d the concrete pipe may be moved.
If an aerial photograph is taken with this camera tilted angleA=35° at an altitude 5000ft., calculate for the ground distance of the angular coverage 60°.
hydrogen is flowing in a 50 mm diameter pipe at a mass rate of 0.01 kg/s. at section 1 the pressure is 280 kPa abs and t= 25 . what is the average velocity?
Water flows through a horizotal 45 deg reducing bend with a 36 inch. diameter upstream and a 24 inch diameter downstream, at the rate of 20 cfs under a pressure of 15 psi at the upstream end of the bend. Neglecting head loss in the bend, calculate..
The slope of the channel is .15% and the mannings roughness coefficient is .038. estimate the depth 100m upstream of a section where the flow depth is 2.2m using the standard step method. Approximate how far upstream of this section would you exp..
Calculate the metric tons of gravel required to fill an excavated area 70 meters by 50 meters by 2 meters deep if the gravel has a density of 1890 kg/(m^3).
Assuming constant acceleration, determine how long the train blocked the crossing. Dis- regard the width of the crossing.
A fully loaded, ocean going container ship is just stable about its longitudinal axis (roll). The ship has a total weight of 155,000 tons, length = 1,600 feet and a beam = 150 feet (assume that it is the shape of a rectangular box). Calculate the ..
A steel bar serving as a vertical hanger to support heavy machinery in a factory is attached to a support by the bolted connection. The main part of the hanger has a rectangular cross section with width b1 = 1.5 in. and thickness t = 0.5 in.
The subcritical water level in the channel downstream from the stilling basin is at an elevation of 100 feet above the datum. assume no energy loss over the spillway, determine the invert of the stilling basin required to form a hydraulic jump in ..
The motor in the unit runs at 300 rpm and produces an unbalanced force of 60 lb at this speed. Neglect weight of the beams and assume 1% viscous deflection in the system; for steel E=30,000 ksi.
Calculate the fraction of total atrazine that will be adsorbed to the soil given that the soil has an organic carbon content of 2.5%. The bulk density of the soil is 1.25 g/cm3; this means that each cubic centimeter of soil (soil plus water) conta..
design a bar screen for a peak average flow of 0.46m3/s.you can consider reasonable assumptions.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd