Dawes road and jeff hamilton road intersection redesign

Assignment Help Other Engineering
Reference no: EM13858104

Dawes Road and Jeff Hamilton Road Intersection Redesign

The Mobile County and Alabama Department of Transportation desire a redesign of the intersection of Jeff Hamilton Road and Dawes Road due to safety issues and poor level of service. Traffic counts are provided. The project needs to include the geometric design of the intersection, signal and traffic sign layout, low impact pavement design, and hydrologic design for the site.

Make necessary assumptions for purpose of analyses and design calculations.

Reference no: EM13858104

Questions Cloud

Data for a community health center : Given the following data for a community health center, calculate the average and marginal cost for each output level and (in case of marginal cost) between successive output levels.
Develop inventory-tracking system for your business services : As a systems analyst, you have been involved in a project to develop an inventory-tracking system for your business services office. The project is now coming to its final stages and you have been asked to write a training manual.
Question regarding the middle-class squeeze : 1. What is the "middle-class squeeze"? 2. How do low unemployment rates mask the economic challenges people face in maintaining middle-class status?
Statement of retained earnings and a balance sheet : Prepare an Adjusted Trial Balance and prepare an Income Statement, Statement of Retained Earnings and a Balance Sheet.
Dawes road and jeff hamilton road intersection redesign : Dawes Road and Jeff Hamilton Road Intersection Redesign. The Mobile County and Alabama Department of Transportation desire a redesign of the intersection of Jeff Hamilton Road and Dawes Road due to safety issues and poor level of service.
Quantity theory of money : QUESTION 1: According to the quantity theory of money, the quantity of money determines the
Create a table of entities and activities : Create one file in Excel with two worksheets - Name the first worksheet "Table" and create a Table of Entities and Activities.
Develop a context diagram and system level data flow diagram : Develop a Context Diagram and a System Level Data Flow Diagram , make sure you properly identify all the components. Develop an ERD as well making sure you properly label the Entity name.
Conduct audit of the jabin hopkins institute of technology : In Part A you are required to conduct an audit of the Jabin Hopkins Institute of Technology (JHIT) site. This audit requires you to collect a range of information about JHIT's organisational Workplace Health and Safety framework. You will also co..

Reviews

Write a Review

Other Engineering Questions & Answers

  Derive the boolean expression for combinational logic

Derive the Boolean expression for combinational logic.

  Involve interaction with technology

Most jobs involve interaction with technology in some form. Police officers have computers in their squad cars, nurses enter your blood pressure and pulse into electronic files.

  Produce a system-wide architectural requirements

Produce a system-wide (non-functional) requirement document that documents the architectural requirements the system must address.

  Define the queueing system

Define the queueing system by describing the customers, arrival rate, expected interarrival time, server(s), service rate, and expected service time. Use Kendall's notation to define the queueing system.

  Find the economic life with interest rate

Find the economic life, with interest rate 12%, of an asset. Initial cost is $5,500. Operation cost is $1,200 per year. Salvage value decreases 15% of new value per year.

  Analyze the parent goal of the maintain node

Analyze the parent goal of the Maintain [SufficientRouteSeparation] node. Restructure and redraw the provided model fragment, by use of the decomposition-by-case and milestone-driven patterns, so that the use of both patterns are explicit and separ..

  Installation of fm radioat this time working at xxxplace

installation of fm radioat this time working at xxxplace nbspi did budget requisition for equipment needed for radio

  What measurements can possibly be made

What measurements can possibly be made in order to determine if corrosion is taking place and what is a salt bridge? What purpose does it serve? With respect to ORP analyzer

  Block diagram, system performance and responses

Questions based on Block Diagram, System Performance and Responses.

  Complete product design specification

What other information would be required to be able to write a more complete Product Design Specification and derive at least four concept designs to satisfy the given specification. Use short written descriptions and simple sketches to illustra..

  Configurations for controlled and uncontrolled rectification

Understand common configurations for controlled and uncontrolled rectification and understand common configurations for controlled and uncontrolled rectification

  A repulsive potential energy should be a positive one

Using the data provided on the webvista site in the file marked vdw.txt, try to develop a mathematical equation for the vdW potential we discussed in class, U(x), that best fits the data

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd