Compute the least-squares line for predicting vertical

Assignment Help Civil Engineering
Reference no: EM13561594

An article reports measurements of expansion for several concrete bridges in the area of Quebec City. Following are measurements of horizontal and vertical expansion (in parts per hundred thousand) for several locations on the Pere-Lelievre Bridge.

Horizontal 20 15 43 5 18 24 32 10 21

Vertical 58 58 55 80 58 68 57 69 63

a) Compute the least-squares line for predicting vertical expansion from horizontal expansion.

b)Compute 95% confidence intercals for B0 and B1.

c) Compute a 95% prediction interval for the vertical expansion at a location where the horizontal expansion is 25.

d) It is desired to predict the vertical expansion in two locations. In one location the horizontal expansion is 15, and in the other it is 30. If 95% prediction intervals are computed for the vertical expansion in both locations, which one will be wider? Explain?

Reference no: EM13561594

Questions Cloud

Determine three bars each of mass 3 kg and lenght of 450mm : Three bars each of mass 3 kg and lenght of 450mm are welded together and are pin connected to two links be and cf. neglecting the weight of the links, determing the force in each link immediately after the system is released from rest.
Calculate the escalaed dollar irr for an escalated dollar : An investment of $80,000 is projected to generate escalated dollar net revenues (income minus costs) of $10,000 in year one, $30,000 in year 2 and $40,000 in year 3 with a $100,000 salvage
Develop a mass balance for this problem and estimate : You purchase a house with a known radon problem. The house has a 1 m high dirt-floored crawl space. The emission rate of radon into the crawl space is reported to be 0.6 pCi/m2s.
Calculate the maximum bending stress due to the load : Calculate the maximum bending stress due to the load q if the beam has a rectangular cross section with width b=140mm and height h=240 mm.
Compute the least-squares line for predicting vertical : An article reports measurements of expansion for several concrete bridges in the area of Quebec City. Following are measurements of horizontal and vertical expansion (in parts per hundred thousand) for several locations on the Pere-Lelievre Bridge.
Determine force acting on the sluice gate : The flow rate of water through a 8 meter wide channel is controlled by a sluice gate. The flow depths are measured to be 1.3 and 0.45 meters upstream and downstream from the gates. Determine force acting on the sluice gate
What are some of the properties that make aluminum : What are some of the properties that make aluminum an extremely useful engineering material?
Estimate how fast the solvent volatilizes : Use the same conditions as (a), except a rainstorm covers the TCE with 1 cm of water. Assume TCE dissolves into water and quickly reaches equilibrium with the water.
What operating gear and speed do you estimate : Stripping overburden in the Illinois coal belt, the Dusty Coal Company uses 270-horsepower, track-type tractors (with direct-drive transmissions) and drawn scrapers. The overburden is a very soft loam that weighs 2,800 lb/yd (loose). Estimated RR fac..

Reviews

Write a Review

Civil Engineering Questions & Answers

  How to determine the horizontal length of ab

In taping from A to B, a tree on-line necessitated setting an intermediate point C offset 4.5ft to the side of line AB. Line AC was then measured as 368.92ft along a uniform 4% slope

  Calculate what is the surface area of the disk rotor

During frequent braking under race conditions the disk brake rotors on the car described above reach a temperature of 500C. These disk brakes rely on forced convection to cool them.

  Calculate the rate of entropy change for each component

Calculate the rate of entropy change for each component of a refrigerator that uses 10 kW power, rejects 14 kW heat and has a high temperature reservoir at 400 K

  What is your recommendation for the maximum size of coarse

What is your recommendation for the maximum size of coarse aggregate for the following situation?

  Determine present worth of costa for purchasing the analyzer

At the end of the first 5 years, the company upgraded the analyzer at a cost of $10,000. Following the upgrade the lab purchased another 5 year maintanence contract for $1000 a year, payable at the end of each year.

  Determine the weight w of the container to a ceiling

a container is supported by three cables that are attached to a ceiling. Determine the weight W of the container, knowing that the tension in cable AB is 6 kN

  What is future work of the entire cash flow series in year

the cash flow sequence $70+4k, where k is in years and cash flow is in $1000. What is the future work of the entire cash flow series in year 10 at 10% per year

  Determine the mass nd specific volume of argon gas in vessel

Determine the mass and specific volume of argon gas in a vessel at 150 kPa and 20°C. The vessel is spherical, with radius 5 m.

  Define the control variables and formulate the mathematical

No more than 12 units of TV, 40 units of radio and 25 units of direct mail are available. A minimum of 9 units of radio and 5 units of direct mail must be purchased.

  What tube diameter is needed if water level in tube is rises

An open, clean glass tube (theta = 0 degrees) is inserted vertically into a pan of water. What tube diameter is neededif they water level in the tube is to rise one tube diameter (dueto surface tension)

  Which one of the following would have the greatest impact

A spread footing supported on a sandy soil has been designed to support a certain column load with a factor of safety of 2.5 against bearing capacity failure. However, there is some uncertainty in both: the column load, P, and the friction angle, ?

  What was students associated perception per reaction time

the student strikes the sign at a speed of 25 mi/h. if the student was traveling at 55 mi/h when the sign was first spotted, what was the students associated perception/ reaction time

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd