Calculate equivalent pipe size and flow in the pipe

Assignment Help Civil Engineering
Reference no: EM1383506

Water is transported from a reservoir at higher elevation to another reservoir through a series of three pipes. The first pipe of 0.4-m diameter is 500 m long, the second pipe 600 m long, size 0.3 m, and the last pipe is 500 m long of diameter 0.2 m. If the elevation difference between two reservoirs is 30 m, calculate equivalent pipe size and flow in the pipe.

Reference no: EM1383506

Questions Cloud

Largest acceptable value of distance for removing a nail : To remove a nail, a small block of wood is placed under a crowbar, and a horizontal force P is applied as shown. Knowing that the maximum vertical force needed to extract the nail is 2600 N and that the horizontal force P is not to exceed 290 N, d..
Existing equal tangent sag curve : An overpass is being built over the PVI of an existing equal tangent sag curve. The sag curve has a 70 mi/h design speed, and G1 = -6%, G2 = +3%.
Travel of particle during time period : Determine the acceleration when t = 4 s, the displacement from t = 0 to t = 10 s, and the distance the particle travels during this time period.
Coefficient of static friction between pacakges : The belt starts from rest at time t=0 and its speed increases at a constant rate of 150mm/s^2. Knowing that the coefficient of static friction between the pacakges..
Calculate equivalent pipe size and flow in the pipe : The first pipe of 0.4-m diameter is 500 m long, the second pipe 600 m long, size 0.3 m, and the last pipe is 500 m long of diameter 0.2 m. If the elevation difference between two reservoirs is 30 m, calculate equivalent pipe size and flow in the p..
Determine the total shortening of the pile : a) Determine the total shortening of the pile in terms of F, L, A, and E; b) If F=96 kips, L=40 ft., A=100in2, and E=1.5 x 106 psi, how much does such a pile shorten?
Maximum tensile and compressive bending stresses : When P = 800 lb, A) Draw the shear and bending moment diagram along its length; B) Determine the maximum tensile and compressive bending stresses; and C) determine the maximum shear stress.
Determining the velocity of motor having constant power : A constant power of 1.5 hp is supplied to the motor while it operates with an efficiency of ε = 0.8. Determine the velocity of the 200-lb crate in 15 seconds, starting from rest. Neglect friction.
Angular acceleration of the spool : determine the angular acceleration of the spool and the acceleration of the trailer. The wheels have negligible mass and are free to rotate.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Problem related to specific gravity of solids

A soil specimen has a water content of 18% and a wet unit weight of 118.5 lb/cu. ft. The specific gravity of solids is found to be 2.72. Find the:

  Volume of soil-excavated from the borrow pit

The volume of fill required is 2500 cubic meters. Find the volume of soil that must be excavated from the borrow pit to furnish the required volume of fill. (in cubic meters).

  Time inventory system for a product

How appropriate might a just in time inventory system be for a product such as roller skates?

  Angular acceleration of the spool

determine the angular acceleration of the spool and the acceleration of the trailer. The wheels have negligible mass and are free to rotate.

  Determining the velocity of motor having constant power

A constant power of 1.5 hp is supplied to the motor while it operates with an efficiency of ε = 0.8. Determine the velocity of the 200-lb crate in 15 seconds, starting from rest. Neglect friction.

  Calculate net present value

Set up life cycle diagram for both alternatives and calculate net present value (NPT) and annual cost for the life time.

  Shafts in a speed-reducer unit

The two shafts in a speed-reducer unit are subjected to couples of magnitude M1 = 18 N · m and M2 = 7.5 N · m, respectively.

  Crystalline or atomic structure

Describe the crystalline or atomic structure of the following minerals: 1) Brucite 2) Gibbsite 3) Bentonite 4) Illite

  Elevation and stationing of the low point

A 1600 ft long sag verical curve (equal tangent) has a pvc at station 1200+00 and elevation o 1500 ft. the initial grade is -3.5% and the final grade is 6.5%. determine the elevation and stationing of the low point, pvi and pvt.

  Horizontal motion of plunger and shaft

The horizontal motion of plunger and shaft is arrested by resistance of the attached disk which moves through the oil bath. If the velocity of plunger is v.

  Installation of motor on pw criterion

At the end of 15 years, the first motor will have a salvage value of $50 and the second motor will have a salvage value of $100. consider the MARR to be 8%. (note : 1HP=0.7457 kw). Determine which motor should be installed based on the PW criterio..

  Average shearing stress

Two strips of a plastics material are bonded together as shown. The average shearing stress in the glue must be limited to 1000 kpa.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd