+1-415-670-9189
info@expertsmind.com
A case study in c to java conversion and extensibility
Course:- Software Engineering
Length: 8
Reference No.:- EM13371




Assignment Help
Expertsmind Rated 4.9 / 5 based on 47215 reviews.
Review Site
Assignment Help >> Software Engineering

Case study "Beyond the Black Box: A Case Study in C to Java Conversion and Product Extensibility "

1. Explain why you believe the project managers elected to go to a system that was 100% Java. 

2. Determine whether you believe the solution presented in the case would have been better to have left the system as-is, go 100% Java, or 100% C. Support your position.

3. Speculate how utilizing .Net instead of Java would have compared to the 2.0 system that was developed entirely in Java.

4. Predict the challenges that you believe the team may encounter when designing and implementing this new system.

Report inhibits

Introduction

Why JAVA

Supportive Ideas

Utilization of .Net

Challenges

Quality Resources




Put your comment
 
Minimize


Ask Question & Get Answers from Experts
Browse some more (Software Engineering) Materials
Describe what you see as the future of Software Engineering challenges particularly applied to Engineering projects. Increasingly, such projects have (and rely upon) very la
Think about a narrow topic or application by selecting a specific real or fictional company and a specific business process within that company or even a specific aspect of
Show the relationship between a software development kit (SDK) and an integrated development environment (IDE). Provide examples of each. How do IDEs and SDKs work together
Discuss what it will take to build a Web architecture, move an existing Website with minimal downtime, and provide a disaster recovery solution to ensure the site is always
Look up and research an instance where a business has encountered an event (disaster, hack, environmental issue, etc) and provide a brief synopsis of how they should review an
Explain why a high degree of coupling among components of a software system can make maintenance of the system dif?cult. Provide at least one example that supports your answ
The make purchase decision is an important management prerogative. Assumed to be a manager of a software company that has an average software development cost of $20/LOC.
Describe how Specific Practices defined in Process Area Project Planning (PP) support the Specific Practices defined in Process Area Project Monitoring and Control (PMC). Th