+1-415-670-9189
info@expertsmind.com
A case study in c to java conversion and extensibility
Course:- Software Engineering
Length: 8
Reference No.:- EM13371




Assignment Help
Expertsmind Rated 4.9 / 5 based on 47215 reviews.
Review Site
Assignment Help >> Software Engineering

Case study "Beyond the Black Box: A Case Study in C to Java Conversion and Product Extensibility "

1. Explain why you believe the project managers elected to go to a system that was 100% Java. 

2. Determine whether you believe the solution presented in the case would have been better to have left the system as-is, go 100% Java, or 100% C. Support your position.

3. Speculate how utilizing .Net instead of Java would have compared to the 2.0 system that was developed entirely in Java.

4. Predict the challenges that you believe the team may encounter when designing and implementing this new system.

Report inhibits

Introduction

Why JAVA

Supportive Ideas

Utilization of .Net

Challenges

Quality Resources




Put your comment
 
Minimize


Ask Question & Get Answers from Experts
Browse some more (Software Engineering) Materials
Review the Personal Trainer fact-finding summary and draw an ERD with cardinality notation. Assume that system entities include members, activities and services, and fitne
You have been hired by the senior management team of a publishing house to evaluate the efficacy of systems and process integration with the organization's book distribut
Suppose you have algorithm with the five running times listed below(assume these are the exact running times)how much slower do each of these algorithms get when you (a) doubl
Define and explain, in your own words, the primary challenge(s) of software development projects. Compare and contrast at least three (3) different software development method
Just-in-time(JIT) software is unable to foresee delivery problems resulting from bad weather, labor strikes, etc. Assess how a company using JIT inventory management software
Planning and executing verification and validation (Focused Discussion) : Question: V and V processes are critical to any kind of IT project. Validation has links with inte
The subset-sum problem is defined as follows: given a set B of n positive integers and an integer K, can you find a subset of B whose elements' summation is equal to K? Desi
Populate the graph with edges connecting concepts/classes as of the given statements above. You need to consider that these edges will be labelled by the predicate in the gi