Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Yates Correction for Continuity for 2x 2Tables
If any cell frequency in 2x 2 table isles than 5thenfor the application of X2 test it is pooled with the preceding or succeeding frequency so that total become greater than 5. This will decrease the degree freedom. Since for 2x2 table the degree of freedom is equal 1 and the degree of freedom after adjusting for pooling would be equal to ( 1-1) zero. This is absurd because we must have at least 1 degree of freedom for application of x2 test.
In such situation we apply Yates correction for continuity. Thus by adding 0.5 to the cell frequency which is less than 5 and adjusting the remaining frequencies accordingly because the totals of rows and columns are fixed in 2x2 contingency table the value of X2 after applying Yates correction will be .
X2= N( |ad -b c|-N c)2/ (a + c) (b + d) (a+ b) ( c + d)
Where |ab - bc | is the absolute value of deviation after ignoring negative sings if any.
You should remember Yates correction for continuity = 1 and N is small.
Is applied only when the degree of freedom is.
a. Discuss the methodology of Operations Research.
EXPLAIN THE CONCEPT OF DUALITY IN LPP THROUGH A LIFE SITUATION
Chi square Test for the Population variance When we want to test that a random sample has been drawn from a normal population having specified variance then X2 statist
A paper mill produces two grades of paper viz., X and Y. Because of raw material restrictions, it cannot produce more than 400 tons of grade X paper and 300 tons of grade Y paper i
A paper mill products two grade of paper viz., X & Y. Because of raw material restriction, it cannot produce more than 400 tons of grade X paper & 300 tons of grade Y paper in a we
Which model is described as a rule of thumb
These models are used when one must decide the optimal time to replace equipment for one reason or the other for instance, in the case of equipment whose efficiency dete
O.R REPLACES MANAGEMENT BY PERSONALITY
what are the objectives of operation research?
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd