working capital, Basic Statistics

Assignment Help:
prepare an estimate of working capital requirements from the following information
1. project annual sales 1,00000/-
2. selling price Rs. 8/unit
3.percentage of net profit on sales 25%
4. average credit period allowed by suppliers 4 weeks
5. average credit period allowed by customers 8 weeks
6. average stock holding in terms of sales requirement 12 weeks
7. allow 10 per cent for contigencies

Related Discussions:- working capital

Two hanging masses, Two blocks with masses and hang one under the other. ...

Two blocks with masses and hang one under the other. For this problem, take the positive direction to be upward, and use for the magnitude of the acceleration due to gravity. Fi

Probability, the probability that you win a game is 0.3. if you play the ga...

the probability that you win a game is 0.3. if you play the game 20 times. what is the probability that you will win at least 8 times?

Group project in statistics, I) Introduction 1) Topic (s) 2) Survey Questi...

I) Introduction 1) Topic (s) 2) Survey Question 3) Type of Sampling 4) Why? II) Calculations 1) Data Analysis (Charts, sample mean, sample standard deviation) 2) Probability 3) E

Ascertainment bias, Ascertainment Bias A possible form of the bias, ma...

Ascertainment Bias A possible form of the bias, mainly in retrospective studies, which arises from a relationship amongst the exposure to the risk factor and the probability o

Define Ancillary costs, Define Ancillary costs Expenditures that is direct...

Define Ancillary costs Expenditures that is directly attributable to resource acquisition, such as freight and transportation costs, site preparation costs, and professional charg

Assignment, How much it will cost to get an assignment

How much it will cost to get an assignment

SPSS, Assignments due 9/14/2012 Need pricing

Assignments due 9/14/2012 Need pricing

Estimate stand-up time using the rmr system, SCENARIO It is proposed to...

SCENARIO It is proposed to construct a 3m diameter, 50m long tunnel, heading 0950, through the andesite lava flow at Maori Bay (Muriwai). As part of the preliminary investigati

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd