Why earthing is required for any electrical equipments, Electrical Engineering

Assignment Help:

Why earthing is required for any electrical equipments, domestic installation and service building etc? For TL coaches what is the minimum I.R. value needed for new wiring?

Ans: To drain away any leakage of currents due to poor insulation and to save human life from dangerous shock and also to avoid burnt of electrical equipment.

The minimum IR value needed for wiring is 2M?'s and minimum IR value required in service for giving coach fit for service is 1M?.


Related Discussions:- Why earthing is required for any electrical equipments

Oscilloscope probe compensation, Q.   what is oscilloscope probe compensati...

Q.   what is oscilloscope probe compensation and how is it adjusted?  What effects are noted when the compensation is not correctly adjustment? Direct Probe: This probe  is

#boiler troubles, Ask question #Minimum 300 words accepted#

Ask question #Minimum 300 words accepted#

Find the initial current, In the circuit shown below, the capacitor initial...

In the circuit shown below, the capacitor initially has a voltage across it 4 Volts (at t = 0). a.  Write down the expression for V C (t) when the switch is closed. b.  Writ

Design the synchronous sequential circuit for state diagram, Design the Syn...

Design the Synchronous Sequential Circuit for State Diagram Illustration: - We wish to design the synchronous sequential circuit whose state diagram The kind of flip-f

Illustrate the photo-conductive cell, Illustrate in detail digital encoders...

Illustrate in detail digital encoders. Illustrate the following with their application: Photo-conductive cell Photo-voltaic cell

Transformer onnection, what is difference between scot and delta connection...

what is difference between scot and delta connection.

When both mt2 and gate are negative, When both MT 2 and Gate  are Negativ...

When both MT 2 and Gate  are Negative In this case N 3   works as a remote gate. Current  flows form layer P 2 to layer  N 3 junction N 1 P 1 is reverse biased  and it  br

Jump instruction - branch operations , Jump Instruction There are two ...

Jump Instruction There are two types of jump  instruction unconditional jump conditional jumps

Complement method of binary subtraction , complement method of binary subtr...

complement method of binary subtraction This  method is  used for  subtraction  as subtraction is  converted to addition. Use following  steps  to perform  subtraction ;

Why two rectifier is used in smps, Its not essential that a power plant use...

Its not essential that a power plant uses only two rectifiers, it depends on the load there at the site and the capacity of the rectifier or SMPS. Assume the load at the site is 12

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd