Why earthing is required for any electrical equipments, domestic installation and service building etc? For TL coaches what is the minimum I.R. value needed for new wiring?
Ans: To drain away any leakage of currents due to poor insulation and to save human life from dangerous shock and also to avoid burnt of electrical equipment.
The minimum IR value needed for wiring is 2M?'s and minimum IR value required in service for giving coach fit for service is 1M?.
Q. Draw and explain an RC integrator, with equations RC Integrator is a low pass RC circuit in which the output is taken across capacitor. The low pass RC circuit gives conside
HT Metering The following type of meters is generally used for HT consumers: Trivector Meter, Bivector Meter, and Summation Meters. Trivector Meter
Q. The efficiency of a 400-kVA, single-phase, 60-Hz transformer is 98.77% when delivering full-load current at 0.8 power factor, and 99.13%with half rated current at unity power fa
modes of operation of 8255
Why is the signal first attenuated and then amplified?
A very widely used alternative form of synchronous motor is the ' indu c tion motor'. This has the advantage that it does not require an auxiliary motor to run the rotor up t
Although the low side is not as good a choice as the high-side local oscillator frequency, let an AM broadcast receiver be designed with a low-side local oscillator. As fc is varie
A LIT (linear time-invariant) system, impulse response h [ n ], is described by: (a) Show the block-diagram representation for this FIR filter (only use multiplier, adder
P-N Junction A p-n junction is made by joining P-type and N-type semiconductors together in extremely close contact. The word junction consider to the boundary interface
Q. Balanced wye-connected loads drawing 10 kW at 0.8 power factor lagging and 15 kW at 0.9 power factor leading are connected in parallel and supplied by a 60-Hz, 300-V, three-phas
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd