Why earthing is required for any electrical equipments, Electrical Engineering

Assignment Help:

Why earthing is required for any electrical equipments, domestic installation and service building etc? For TL coaches what is the minimum I.R. value needed for new wiring?

Ans: To drain away any leakage of currents due to poor insulation and to save human life from dangerous shock and also to avoid burnt of electrical equipment.

The minimum IR value needed for wiring is 2M?'s and minimum IR value required in service for giving coach fit for service is 1M?.


Related Discussions:- Why earthing is required for any electrical equipments

Design an appropriate system, From a source with P in = 2.4 mW, we want to...

From a source with P in = 2.4 mW, we want to get P out = 60 mW at a distance l = 20 km from the source. α for the transmission line is given to be 2.3 dB/km. The available amplif

Hall effect is associated with which material, Hall Effect is associated wi...

Hall Effect is associated with (A) Conductors. (B) Semiconductors. (C) Thermistors. (D)Solders. Ans: Hall Effect is associated with semiconductors.

Determine phase - voltage and power, Determine phase - voltage and power: ...

Determine phase - voltage and power: A balanced star connected load is supplied from a symmetrical 3-phase 440 Volt system. The current in each of the phase is 40 Amp and lags

Partial derivatives - transistor hybrid model, Partial derivatives - Transi...

Partial derivatives - Transistor hybrid model: The partial derivatives are taken by keeping the collector voltage or base current constant as pointed out by the subscript atta

Motor windings, What is the main function of dummy coul in winding?

What is the main function of dummy coul in winding?

Emirrer feedback bias, RE should be made large enough to swamp out rB/ B. h...

RE should be made large enough to swamp out rB/ B. how does making RE large saturate the transistor b

Calculate expected peak demand for transformer, What is the expected peak d...

What is the expected peak demand for a transformer feeding the following loads?                           Connected                 kVA

Illustrate computer-controlled routing, Q. Illustrate Computer-controlled r...

Q. Illustrate Computer-controlled routing? Computers are employed in network with common channel signaling (CCS) features. In CCS, there is a separate computer-controlled signa

Common-drain jfet amplifier, Q. Common-Drain JFET Amplifier? Figure (a)...

Q. Common-Drain JFET Amplifier? Figure (a) shows a CD JFET amplifier in which resistors R 1 , R 2 , and R SS are selected by the bias design, and capacitors CG and CS are chos

Test schedule - meter testing, Test Schedule - Meter Testing The test ...

Test Schedule - Meter Testing The test schedule as per the Central Electricity Authority Regulations on Installation and Operation of Meters is given below. Table: Test S

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd