What is unitary method, Mathematics

Assignment Help:

Explanation of  Unitary Method

Unitary Method keeps of following two steps:- 

    Step 1 involves find the value of one unit. 

    Step 2 involves find the value of required units. 

Below are some examples explaining Unitary Method. 

Example A 5 buses carry 200 passengers. How many passengers can 20 buses carry ? 

Answer = The process is as :- 

    Step 1 = Calculate how many passengers 1 bus carry : 

To find this, we have to divide the given number of passengers(200) by given number of buses(5) because one bus will carry less passengers as compared to 5 buses 

5 buses carry passengers = 200 

1 bus carry passengers = 200 ÷ 5     = 40 

Step 2 = Determine how many passengers 20 bus carry : 

To find, we have to multiply the necessary number of buses(20) with number of passengers one bus can carry(40) because more buses will carry more passengers. 

1 bus carry passengers = 40 

5 buses carry passengers = 40 × 20     = 800. 

 

Alternative Method 

Above mentioned method is so long. Once you understand the concept of Unitary Method, you can directly apply this method in following ways :- 

5 buses carry passengers = 200 

1 bus carry passengers = (200 ÷ 5) 

20 bus carry passengers = (200 ÷ 5) × 20     = 40 × 20     = 800. 

Example 2 = 5 worker can complete a work in 20 days. In how many days same work will be completed if 10 workers are employed. 

Answer = The process is as :- 

    Step 1 = Find in how many days 1 worker will do the given work. 

To find this, we have to multiply the given worker(5) with given number of days(20) because one worker will take more days to complete the given work as compared to 5 workers. 

5 workers complete the given works in days = 20 

1 worker complete the given works in days = (20 × 5)     = 100 

Step 2 = Find in how many days 10 worker will do the given work. 

To find this, we have to divide numbers of days in which 1 worker will complete(100days) by the required number of workers(10) because more men complete given work in lesser days. 

1 worker complete the given works in days = 100 

10 workers complete the given works in days = (100 ÷ 10)     = 10 

Alternative Method 

Above mentioned method is long. Once you understand the concept of Unitary Method, you can directly apply this method in following ways :- 

5 workers complete the given works in days = 20 

1 worker complete the given works in days = (20 × 5) 

10 workers complete the given works in days = (20 × 5) ÷ 10     = 100 ÷ 10     = 10


Related Discussions:- What is unitary method

Determine the number of combinations, 3 items x, y and z will have 6 differ...

3 items x, y and z will have 6 different permutations however only one combination. The given formular is generally used to determine the number of combinations in a described situ

Partial Differential Equation, Consider the wave equation u_tt - u_xx = 0 w...

Consider the wave equation u_tt - u_xx = 0 with u(x, 0) = f(x) = 1 if -1 Please provide me a detailed answer. I had worked the most part of this question and the only I would like

Find the initial number of balls, Balls are arranged in rows to form an equ...

Balls are arranged in rows to form an equilateral triangle .The first row consists of one ball, the second two balls and so on.   If 669 more balls are added, then all the balls ca

find out the dimensions which will minimize, We desire to construct a box ...

We desire to construct a box whose base length is three times the base width. The material utilized to build the top & bottom cost $10/ft 2 and the material utilized to build the

Conditional statement, if two lines in s plane never intersect then they ar...

if two lines in s plane never intersect then they are parallel

What are the properties of normal distribution, What are the properties of ...

What are the properties of Normal distribution? The normal curve is symmetrical when p=q or p≈q The normal curve is a single peaked curve The normal curve is asymptotic t

Two circles touching internally prove that ox:oy=oa:ob, Two circles touchin...

Two circles touching internally at O. OXY, OAB straight lines, the latter passing through the centres. Prove that OX : OY = OA : OB. Given : Two circles touching internally a

Emi, calculation of emi %

calculation of emi %

Identify the surface for the equation , Identify the surface for each of th...

Identify the surface for each of the subsequent equations. (a) r = 5 (b) r 2 + z 2 = 100 (c) z = r Solution (a)  In two dimensions we are familiar with that this

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd