What is the scope of waste heat boilers, Managerial Accounting

Assignment Help:

What is the Scope of Waste heat boilers

This specification covers the minimum requirements for the design, material selections, fabrication, testing and inspection of shop- / or field- assembled and welded waste heat recovery boilers.  The steam drum shall produce dry saturated steam (DSS) at a maximum continuous rating (MCR) as specified on the data sheet.

The boiler's circuit shall be designed for operation with a steam drum and a fired tube-type exchanger.  All control equipment and all instruments shall be located inside a housing enclosing one end of the steam drum.

Each boiler shall be of natural circulation type with individual circulation ratio not less than 12:1.

Each boiler shall be furnished with a steam drum supplied with relief (as approved by WorleyParsons Canada) and blowdown valves, internals, i.e. cyclone type separator, chevron type dryers, feed inlet pipe, riser, downcomer and steam-out connections.

Supplier is responsible for the design, construction and supply of all structures for all equipment support. 

Any deviation from this specification requires prior written acceptance by WorleyParsons Canada.

 


Related Discussions:- What is the scope of waste heat boilers

Prepare two tables showing net profit, Prepare two tables showing net profi...

Prepare two tables showing net profit, residual income and return on investment for each year of the project and also net present value (NPV) for: (i) The BEST OUTCOME; (ii) The

Accounting Ratios, Explain TWO limitations of using accounting ratios to as...

Explain TWO limitations of using accounting ratios to assess the performance of a firm and suggest how each limitation may be improved

Adjacent extreme points, Adjacent extreme points differ in only one variabl...

Adjacent extreme points differ in only one variable The first observation indicates that we can identify the extreme points of the solution space algebraically by setting zero as

What is the scope of waste heat boilers, What is the Scope of Waste heat bo...

What is the Scope of Waste heat boilers This specification covers the minimum requirements for the design, material selections, fabrication, testing and inspection of shop- / o

What rights do the stockholders have, When forming a company, the options a...

When forming a company, the options are sole proprietor, partnership, and corporation. Most choose corporation. Why is the corporate form seen to be best? What rights do the stockh

Market value-transfer pricing methods, Market value There is universal ag...

Market value There is universal agreement that in competitive markets a market value based transfer price should achieve optimal results. In this circumstance, it can be expected

Cost, What are the limation of semi variable cost and how to overcome it?

What are the limation of semi variable cost and how to overcome it?

What are the disadvantages of the cost accounting, Disadvantages of the cos...

Disadvantages of the cost accounting: 1. It is unnecessary: it is argued that maintenance of the cost records is not necessary and involves duplication of work. It is based o

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd